IAC Assessment: OR0289
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0289
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1997
Principal Product Sand, Gravel, Concrete
NAICS n/a
SIC 3281 - Cut Stone And Stone Products
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 871,200
Annual Production 353,284 Tons
Production Hrs. Annual 2,500
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,498 2,880,715 kWh $0.02
Electricity Demand $42,580 9,853 kW-months/year $4.32
Electricity Fees $9,099 - $ -
TOTAL ENERGY COSTS $212,577
RECOMMENDED SAVINGS* $156,664 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,495
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$82,720
Cost:
$56,000
- - - - - - $96,990 - $(-14,270) - - - -
-
kWh
-
-
kW-months/year
-
-
$
$96,990
-
$
$(-14,270)
-
$
-
-
$
02: 2.5194 REDESIGN PROCESS Savings:
$42,400
Cost:
$4,300
- - $(-2,600) (-528) $45,000 - - - - - - - -
-
kWh
$(-2,600)
(-528)
kW-months/year
$45,000
-
$
-
-
$
-
-
$
-
-
$
03: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$25,646
Cost:
$85,000
$(-4,315) (-201,055) $(-4,822) (-984) - - - - - - $34,783 - $(-4,315)
(-201,055)
kWh
$(-4,822)
(-984)
kW-months/year
-
-
$
-
-
$
-
-
$
$34,783
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,495
Cost:
$1,479
$1,348 62,720 $1,147 234 - - - - - - - - $1,348
62,720
kWh
$1,147
234
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,403
Cost:
$13,550
$1,582 73,857 $1,734 360 - - - - $87 - - - $1,582
73,857
kWh
$1,734
360
kW-months/year
-
-
$
-
-
$
$87
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$156,664
Cost:
$160,329
$(-1,385) (-64,478) $(-4,541) (-918) $45,000 - $96,990 - $(-14,183) - $34,783 - $(-1,385)
(-64,478)
kWh
$(-4,541)
(-918)
kW-months/year
$45,000
-
$
$96,990
-
$
$(-14,183)
-
$
$34,783
-
$
TOTAL IMPLEMENTED Savings:
$2,495
Cost:
$1,479
$1,348 62,720 $1,147 234 - - - - - - - - $1,348
62,720
kWh
$1,147
234
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product