IAC logo
IAC Assessment: OR0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product Asphalt, Aggregate, STB
NAICS 212321 - Construction Sand and Gravel Mining
SIC 1442 - Construction Sand And Gravel
Sales $10,000,000-$50,000,000
# of Employees 14
Plant Area (Sq.Ft.) 0
Annual Production 825,000 Tons
Production Hrs. Annual 535
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,182 3,238,200 kWh $0.05
Electricity Demand $91,536 21,192 kW-months/year $4.32
Electricity Fees $18,800 - $ -
Fuel Oil #2 $167,283 40,136 MMBtu $4.17
TOTAL ENERGY COSTS $430,801
RECOMMENDED SAVINGS* $139,493 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,638
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$123,700
Cost:
$303,000
- - - - - - - - $37,200 - - - $86,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$37,200
-
$
-
-
$
$86,500
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,860
Cost:
$5,450
$2,800 57,200 $2,060 476 - - - - - - - - - - $2,800
57,200
kWh
$2,060
476
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$1,778
Cost:
$150
- - - - - - $2,078 267 - - $(-300) - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,078
267
MMBtu
-
-
$
$(-300)
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,960
Cost:
-
$1,240 25,300 $720 166 - - - - - - - - - - $1,240
25,300
kWh
$720
166
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,505
Cost:
-
- - $864 200 $641 - - - - - - - - - -
-
kWh
$864
200
kW-months/year
$641
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,690
Cost:
$20,000
- - - - $5,690 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,690
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$139,493
Cost:
$328,600
$4,040 82,500 $3,644 842 $6,331 - $2,078 267 $37,200 - $(-300) - $86,500 - $4,040
82,500
kWh
$3,644
842
kW-months/year
$6,331
-
$
$2,078
267
MMBtu
$37,200
-
$
$(-300)
-
$
$86,500
-
$
TOTAL IMPLEMENTED Savings:
$6,638
Cost:
$5,600
$2,800 57,200 $2,060 476 - - $2,078 267 - - $(-300) - - - $2,800
57,200
kWh
$2,060
476
kW-months/year
-
-
$
$2,078
267
MMBtu
-
-
$
$(-300)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Administrative Changes Ancillary Material Cost