IAC Assessment: OR0572
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0572
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2011
Principal Product Utility Poles
NAICS 321114 - Wood Preservation
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 28,000
Annual Production 1,000 Units
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,610 1,910,784 kWh $0.04
Electricity Demand $2,568 437 kW-months/year $5.88
Natural Gas $242,360 40,360 MMBtu $6.00
TOTAL ENERGY COSTS $312,538
RECOMMENDED SAVINGS* $28,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,490
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,860
Cost:
$3,642
$6,860 196,000 - - - - $6,860
196,000
kWh
-
-
MMBtu
-
-
$
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,220
Cost:
$2,280
$1,220 34,600 - - - - $1,220
34,600
kWh
-
-
MMBtu
-
-
$
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$770
Cost:
$2,280
$770 21,600 - - - - $770
21,600
kWh
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,350
Cost:
$4,320
- - $2,350 416 - - -
-
kWh
$2,350
416
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,070
Cost:
$4,559
$4,922 127,000 - - $2,148 - $4,922
127,000
kWh
-
-
MMBtu
$2,148
-
$
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$8,030
Cost:
$14,750
- - $8,030 1,110 - - -
-
kWh
$8,030
1,110
MMBtu
-
-
$
07: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$1,280
Cost:
$500
- - $1,780 314 $(-500) - -
-
kWh
$1,780
314
MMBtu
$(-500)
-
$
08: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$1,310
Cost:
$1,170
$1,310 37,126 - - - - $1,310
37,126
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$28,890
Cost:
$33,501
$15,082 416,326 $12,160 1,840 $1,648 - $15,082
416,326
kWh
$12,160
1,840
MMBtu
$1,648
-
$
TOTAL IMPLEMENTED Savings:
$10,490
Cost:
$8,462
$6,860 196,000 $4,130 730 $(-500) - $6,860
196,000
kWh
$4,130
730
MMBtu
$(-500)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes