Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2016 |
Principal Product | Aerospace Parts |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3363 - Aluminum Die-castings |
Sales | $100,000,000-$500,000,000 |
# of Employees | 288 |
Plant Area (Sq.Ft.) | 162,437 |
Annual Production | 50,000 Units |
Production Hrs. Annual | 5,850 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $218,543 | 3,611,700 | kWh | $0.06 |
Electricity Demand | $52,957 | 9,379 | kW-months/year | $5.65 |
Electricity Fees | $21,623 | - | $ | - |
Natural Gas | $66,479 | 7,411 | MMBtu | $8.97 |
TOTAL ENERGY COSTS | $359,602 | |||
RECOMMENDED SAVINGS* | $579,157 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,295 |
#|Description |
Savings Cost |
Status | Natural Gas | Primary Raw Material | By-product Production | Increase in Production | Natural Gas | Primary Raw Material | By-product Production | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | MMBtu | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $357,967 Cost: $669,217 |
$3,767 | 417 | - | - | $(-1,000) | - | $355,200 | - |
$3,767 417 MMBtu |
- - $ |
$(-1,000) - $ |
$355,200 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING |
Savings: $190,362 Cost: $300,000 |
- | - | - | - | - | - | $190,362 | - |
- - MMBtu |
- - $ |
- - $ |
$190,362 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $24,528 Cost: $1,495 |
- | - | $24,528 | - | - | - | - | - |
- - MMBtu |
$24,528 - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.5194 REDESIGN PROCESS |
Savings: $4,005 Cost: $3,500 |
$4,005 | 443 | - | - | - | - | - | - |
$4,005 443 MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $2,295 Cost: $1,000 |
$2,295 | 254 | - | - | - | - | - | - |
$2,295 254 MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $579,157 Cost: $975,212 |
$10,067 | 1,114 | $24,528 | - | $(-1,000) | - | $545,562 | - | $10,067 1,114 MMBtu |
$24,528 - $ |
$(-1,000) - $ |
$545,562 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,295 Cost: $1,000 |
$2,295 | 254 | - | - | - | - | - | - | $2,295 254 MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | MMBtu | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Natural Gas | Primary Raw Material | By-product Production | Increase in Production | Natural Gas | Primary Raw Material | By-product Production | Increase in Production |