IAC Assessment: RU0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1992
Principal Product DIE CAST MOLDS
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 7,000 Pieces
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $250,612 2,654,455 kWh $0.09
Natural Gas $18,053 2,690 MMBtu $6.71
TOTAL ENERGY COSTS $268,665
RECOMMENDED SAVINGS* $31,125 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,214
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,359
Cost:
$5,963
$4,342 46,014 - - $(-983) - $4,342
46,014
kWh
-
-
MMBtu
$(-983)
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$650
Cost:
$500
- - $650 97 - - -
-
kWh
$650
97
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,855
Cost:
$930
- - $1,855 277 - - -
-
kWh
$1,855
277
MMBtu
-
-
$
04: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$508
Cost:
$1,100
- - $508 76 - - -
-
kWh
$508
76
MMBtu
-
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,177
Cost:
$2,500
$6,177 - - - - - $6,177
-
kWh
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,275
Cost:
$2,098
$4,275 45,428 - - - - $4,275
45,428
kWh
-
-
MMBtu
-
-
$
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$10,595
Cost:
$800
$10,595 112,837 - - - - $10,595
112,837
kWh
-
-
MMBtu
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,706
Cost:
$4,000
$3,706 - - - - - $3,706
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$31,125
Cost:
$17,891
$29,095 204,279 $3,013 450 $(-983) - $29,095
204,279
kWh
$3,013
450
MMBtu
$(-983)
-
$
TOTAL IMPLEMENTED Savings:
$5,214
Cost:
$6,893
$4,342 46,014 $1,855 277 $(-983) - $4,342
46,014
kWh
$1,855
277
MMBtu
$(-983)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes