IAC logo
IAC Assessment: RU0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1992
Principal Product THERMOPLASTIC MOLDINGS
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $1,000,000-$5,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 5,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,704 2,648,886 kWh $0.09
Natural Gas $4,298 653 MMBtu $6.58
TOTAL ENERGY COSTS $231,002
RECOMMENDED SAVINGS* $29,077 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,267
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,036
Cost:
-
$2,036 23,740 - - $2,036
23,740
kWh
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,464
Cost:
-
$3,464 40,152 - - $3,464
40,152
kWh
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,690
Cost:
$1,068
$3,690 42,790 - - $3,690
42,790
kWh
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,176
Cost:
$2,500
$7,176 - - - $7,176
-
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,805
Cost:
$107
$1,911 22,274 $(-106) - $1,911
22,274
kWh
$(-106)
-
$
06: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$5,365
Cost:
$800
$5,365 62,427 - - $5,365
62,427
kWh
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,587
Cost:
$1,528
$2,587 30,188 - - $2,587
30,188
kWh
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,120
Cost:
-
$2,120 24,619 - - $2,120
24,619
kWh
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$834
Cost:
$2,250
$834 9,672 - - $834
9,672
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$29,077
Cost:
$8,253
$29,183 255,862 $(-106) - $29,183
255,862
kWh
$(-106)
-
$
TOTAL IMPLEMENTED Savings:
$11,267
Cost:
$4,846
$11,267 131,009 - - $11,267
131,009
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes