IAC Assessment: SD0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product AEROSPACE FASTEN,INSERTS
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 15,000,000 Pieces
Production Hrs. Annual 4,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $253,170 2,303,634 kWh $0.11
Natural Gas $3,510 499 MMBtu $7.03
TOTAL ENERGY COSTS $256,680
RECOMMENDED SAVINGS* $56,907 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,839
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$960
Cost:
$1,377
$960 8,792 - - - - $960
8,792
kWh
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,042
Cost:
$20
$2,042 18,464 - - - - $2,042
18,464
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,909
Cost:
-
$8,556 77,960 - - $(-647) - $8,556
77,960
kWh
-
-
MMBtu
$(-647)
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$17,058
Cost:
$5,430
$15,287 138,921 - - $1,771 - $15,287
138,921
kWh
-
-
MMBtu
$1,771
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,135
Cost:
$700
$764 7,034 - - $371 - $764
7,034
kWh
-
-
MMBtu
$371
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$735
Cost:
$1,980
$498 4,396 - - $237 - $498
4,396
kWh
-
-
MMBtu
$237
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$22,031
Cost:
$300
$20,777 189,039 $1,254 178 - - $20,777
189,039
kWh
$1,254
178
MMBtu
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,037
Cost:
-
$5,037 - - - - - $5,037
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$56,907
Cost:
$9,807
$53,921 444,606 $1,254 178 $1,732 - $53,921
444,606
kWh
$1,254
178
MMBtu
$1,732
-
$
TOTAL IMPLEMENTED Savings:
$29,839
Cost:
$9,507
$28,107 255,567 - - $1,732 - $28,107
255,567
kWh
-
-
MMBtu
$1,732
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes