Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1993 |
Principal Product | TRAFFIC CONTROL SIGNALS |
NAICS | n/a |
SIC | 3669 - Communications Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 20,000 Pieces |
Production Hrs. Annual | 4,334 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $237,140 | 2,385,991 | kWh | $0.10 |
Natural Gas | $30,327 | 5,025 | MMBtu | $6.04 |
TOTAL ENERGY COSTS | $267,467 | |||
RECOMMENDED SAVINGS* | $37,964 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,000 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $648 Cost: $827 |
$648 | 6,448 | - | - | - | - |
$648 6,448 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,078 Cost: $100 |
$2,078 | 20,809 | - | - | - | - |
$2,078 20,809 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $12,414 Cost: - |
$12,414 | - | - | - | - | - |
$12,414 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2514 COVER OPEN TANKS |
Savings: $5,954 Cost: $284 |
$5,954 | 59,789 | - | - | - | - |
$5,954 59,789 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,375 Cost: $85 |
$1,375 | 13,775 | - | - | - | - |
$1,375 13,775 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $189 Cost: $54 |
- | - | $189 | 31 | - | - |
- - kWh |
$189 31 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $598 Cost: - |
$657 | 6,741 | - | - | $(-59) | - |
$657 6,741 kWh |
- - MMBtu |
$(-59) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $2,069 Cost: $3,080 |
$1,711 | 17,292 | - | - | $358 | - |
$1,711 17,292 kWh |
- - MMBtu |
$358 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $682 Cost: $855 |
$682 | 3,224 | - | - | - | - |
$682 3,224 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $2,033 Cost: $2,400 |
$1,737 | 17,585 | - | - | $296 | - |
$1,737 17,585 kWh |
- - MMBtu |
$296 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $6,945 Cost: $4,000 |
$6,790 | 68,288 | - | - | $155 | - |
$6,790 68,288 kWh |
- - MMBtu |
$155 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $2,979 Cost: $300 |
$2,115 | 21,395 | $864 | 143 | - | - |
$2,115 21,395 kWh |
$864 143 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,964 Cost: $11,985 |
$36,161 | 235,346 | $1,053 | 174 | $750 | - | $36,161 235,346 kWh |
$1,053 174 MMBtu |
$750 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,000 Cost: $5,296 |
$16,845 | 169,109 | - | - | $155 | - | $16,845 169,109 kWh |
- - MMBtu |
$155 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |