IAC Assessment: SD0061
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0061
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product TRAFFIC CONTROL SIGNALS
NAICS n/a
SIC 3669 - Communications Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 0
Annual Production 20,000 Pieces
Production Hrs. Annual 4,334
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $237,140 2,385,991 kWh $0.10
Natural Gas $30,327 5,025 MMBtu $6.04
TOTAL ENERGY COSTS $267,467
RECOMMENDED SAVINGS* $37,964 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,000
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$648
Cost:
$827
$648 6,448 - - - - $648
6,448
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,078
Cost:
$100
$2,078 20,809 - - - - $2,078
20,809
kWh
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,414
Cost:
-
$12,414 - - - - - $12,414
-
kWh
-
-
MMBtu
-
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$5,954
Cost:
$284
$5,954 59,789 - - - - $5,954
59,789
kWh
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,375
Cost:
$85
$1,375 13,775 - - - - $1,375
13,775
kWh
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$189
Cost:
$54
- - $189 31 - - -
-
kWh
$189
31
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$598
Cost:
-
$657 6,741 - - $(-59) - $657
6,741
kWh
-
-
MMBtu
$(-59)
-
$
08: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,069
Cost:
$3,080
$1,711 17,292 - - $358 - $1,711
17,292
kWh
-
-
MMBtu
$358
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$682
Cost:
$855
$682 3,224 - - - - $682
3,224
kWh
-
-
MMBtu
-
-
$
10: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,033
Cost:
$2,400
$1,737 17,585 - - $296 - $1,737
17,585
kWh
-
-
MMBtu
$296
-
$
11: 2.7134 USE PHOTOCELL CONTROLS Savings:
$6,945
Cost:
$4,000
$6,790 68,288 - - $155 - $6,790
68,288
kWh
-
-
MMBtu
$155
-
$
12: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,979
Cost:
$300
$2,115 21,395 $864 143 - - $2,115
21,395
kWh
$864
143
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$37,964
Cost:
$11,985
$36,161 235,346 $1,053 174 $750 - $36,161
235,346
kWh
$1,053
174
MMBtu
$750
-
$
TOTAL IMPLEMENTED Savings:
$17,000
Cost:
$5,296
$16,845 169,109 - - $155 - $16,845
169,109
kWh
-
-
MMBtu
$155
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes