IAC logo
IAC Assessment: SD0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1994
Principal Product PVC Pipes
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 68
Plant Area (Sq.Ft.) 44,000
Annual Production 52,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $760,142 9,344,373 kWh $0.08
Natural Gas $14,308 2,245 MMBtu $6.37
TOTAL ENERGY COSTS $774,450
RECOMMENDED SAVINGS* $75,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,662
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$27,894
Cost:
$27,500
$27,894 342,907 $27,894
342,907
kWh
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$473
Cost:
$136
$473 5,862 $473
5,862
kWh
03: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$15,214
Cost:
$24,880
$15,214 186,987 $15,214
186,987
kWh
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$16,815
Cost:
$8,515
$16,815 206,624 $16,815
206,624
kWh
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,613
Cost:
-
$8,613 33,705 $8,613
33,705
kWh
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$587
Cost:
$300
$587 7,327 $587
7,327
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$881
Cost:
$3,241
$881 9,086 $881
9,086
kWh
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,220
Cost:
$1,800
$1,220 13,189 $1,220
13,189
kWh
09: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$2,892
Cost:
$240
$2,892 32,532 $2,892
32,532
kWh
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$723
Cost:
$800
$723 7,913 $723
7,913
kWh
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$261
Cost:
$228
$261 2,931 $261
2,931
kWh
TOTAL RECOMMENDED Savings:
$75,573
Cost:
$67,640
$75,573 849,063 $75,573
849,063
kWh
TOTAL IMPLEMENTED Savings:
$53,662
Cost:
$56,057
$53,662 585,874 $53,662
585,874
kWh