IAC logo
IAC Assessment: SD0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1995
Principal Product Stamped Washers
NAICS n/a
SIC 3721 - Aircraft
Sales $5,000,000-$10,000,000
# of Employees 77
Plant Area (Sq.Ft.) 26,000
Annual Production 270,000,000 Pieces
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,973 966,882 kWh $0.14
Natural Gas $16,929 2,565 MMBtu $6.60
TOTAL ENERGY COSTS $154,690
RECOMMENDED SAVINGS* $59,801 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,488
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz)
$ kWh $ MMBtu $ Tgal $ gal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,611
Cost:
$2,460
$1,611 11,430 - - - - - - $1,611
11,430
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$34,450
Cost:
-
$34,450 - - - - - - - $34,450
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$14,005
Cost:
-
$14,005 - - - - - - - $14,005
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,443
Cost:
$360
$3,443 24,619 - - - - - - $3,443
24,619
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
05: 2.2514 COVER OPEN TANKS Savings:
$1,410
Cost:
$1,014
- - $1,410 151 - - - - -
-
kWh
$1,410
151
MMBtu
-
-
Tgal
-
-
gal
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,019
Cost:
$1,505
$1,019 6,741 - - - - - - $1,019
6,741
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$409
Cost:
$665
$409 2,638 - - - - - - $409
2,638
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
08: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS Savings:
$1,925
Cost:
-
- - - - - - $1,925 9,414 -
-
kWh
-
-
MMBtu
-
-
Tgal
$1,925
9,414
gal
09: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$1,529
Cost:
$2,500
- - - - $1,529 10,460 - - -
-
kWh
-
-
MMBtu
$1,529
10,460
Tgal
-
-
gal
TOTAL RECOMMENDED Savings:
$59,801
Cost:
$8,504
$54,937 45,428 $1,410 151 $1,529 10,460 $1,925 9,414 $54,937
45,428
kWh
$1,410
151
MMBtu
$1,529
10,460
Tgal
$1,925
9,414
gal
TOTAL IMPLEMENTED Savings:
$21,488
Cost:
$5,339
$20,078 42,790 $1,410 151 - - - - $20,078
42,790
kWh
$1,410
151
MMBtu
-
-
Tgal
-
-
gal
Savings
Cost
$ kWh $ MMBtu $ Tgal $ gal
Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz)