Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1996 |
Principal Product | Croutons & Blended Snack Foods |
NAICS | n/a |
SIC | 2099 - Food Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 165 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 2,275,000 Pounds |
Production Hrs. Annual | 7,350 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $94,726 | 1,257,913 | kWh | $0.08 |
Electricity Demand | $18,446 | 2,514 | kW-months/year | $7.34 |
Electricity Fees | $113,172 | - | $ | - |
Natural Gas | $93,950 | 15,456 | MMBtu | $6.08 |
TOTAL ENERGY COSTS | $342,134 | |||
RECOMMENDED SAVINGS* | $39,491 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $39,491 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,866 Cost: $1,600 |
$2,866 | 32,825 | - | - | - | - |
$2,866 32,825 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,410 Cost: $2,372 |
- | - | $1,410 | 264 | - | - |
- - kWh |
$1,410 264 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,358 Cost: $9,951 |
$7,358 | 80,598 | - | - | - | - |
$7,358 80,598 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $4,671 Cost: $5,250 |
$4,671 | 49,531 | - | - | - | - |
$4,671 49,531 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,346 Cost: $1,230 |
$1,346 | 14,068 | - | - | - | - |
$1,346 14,068 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $21,840 Cost: $300 |
- | - | - | - | $21,840 | - |
- - kWh |
- - MMBtu |
$21,840 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,491 Cost: $20,703 |
$16,241 | 177,022 | $1,410 | 264 | $21,840 | - | $16,241 177,022 kWh |
$1,410 264 MMBtu |
$21,840 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $39,491 Cost: $20,703 |
$16,241 | 177,022 | $1,410 | 264 | $21,840 | - | $16,241 177,022 kWh |
$1,410 264 MMBtu |
$21,840 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) |