IAC logo
IAC Assessment: SD0142
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1996
Principal Product Croutons & Blended Snack Foods
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 130,000
Annual Production 2,275,000 Pounds
Production Hrs. Annual 7,350
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,726 1,257,913 kWh $0.08
Electricity Demand $18,446 2,514 kW-months/year $7.34
Electricity Fees $113,172 - $ -
Natural Gas $93,950 15,456 MMBtu $6.08
TOTAL ENERGY COSTS $342,134
RECOMMENDED SAVINGS* $39,491 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,491
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,866
Cost:
$1,600
$2,866 32,825 - - - - $2,866
32,825
kWh
-
-
MMBtu
-
-
lb
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,410
Cost:
$2,372
- - $1,410 264 - - -
-
kWh
$1,410
264
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,358
Cost:
$9,951
$7,358 80,598 - - - - $7,358
80,598
kWh
-
-
MMBtu
-
-
lb
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,671
Cost:
$5,250
$4,671 49,531 - - - - $4,671
49,531
kWh
-
-
MMBtu
-
-
lb
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,346
Cost:
$1,230
$1,346 14,068 - - - - $1,346
14,068
kWh
-
-
MMBtu
-
-
lb
06: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$21,840
Cost:
$300
- - - - $21,840 - -
-
kWh
-
-
MMBtu
$21,840
-
lb
TOTAL RECOMMENDED Savings:
$39,491
Cost:
$20,703
$16,241 177,022 $1,410 264 $21,840 - $16,241
177,022
kWh
$1,410
264
MMBtu
$21,840
-
lb
TOTAL IMPLEMENTED Savings:
$39,491
Cost:
$20,703
$16,241 177,022 $1,410 264 $21,840 - $16,241
177,022
kWh
$1,410
264
MMBtu
$21,840
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)