IAC Assessment: SD0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1996
Principal Product Medical Devices for Open Heart Surgery
NAICS n/a
SIC 3841 - Surgical And Medical Instruments
Sales $50,000,000-$100,000,000
# of Employees 330
Plant Area (Sq.Ft.) 186,000
Annual Production 465,000 Pounds
Production Hrs. Annual 4,590
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $455,481 6,620,457 kWh $0.07
Electricity Demand $129,853 16,405 kW-months/year $7.92
Natural Gas $14,720 1,846 MMBtu $7.97
TOTAL ENERGY COSTS $600,694
RECOMMENDED SAVINGS* $85,657 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,657
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,248
Cost:
$2,380
$2,248 27,550 - - - - - - $2,248
27,550
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$45,359
Cost:
$5,823
- - $45,359 6,340 - - - - -
-
kWh
$45,359
6,340
MMBtu
-
-
lb
-
-
$
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$4,743
Cost:
$450
- - $4,743 593 - - - - -
-
kWh
$4,743
593
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,027
Cost:
$39,147
$24,027 285,463 - - - - - - $24,027
285,463
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,679
Cost:
$2,670
$2,679 29,894 - - - - - - $2,679
29,894
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,177
Cost:
$2,429
$5,177 59,789 - - - - - - $5,177
59,789
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$784
Cost:
$1,450
- - - - - - $784 - -
-
kWh
-
-
MMBtu
-
-
lb
$784
-
$
08: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$640
Cost:
-
- - - - $640 - - - -
-
kWh
-
-
MMBtu
$640
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$85,657
Cost:
$54,349
$34,131 402,696 $50,102 6,933 $640 - $784 - $34,131
402,696
kWh
$50,102
6,933
MMBtu
$640
-
lb
$784
-
$
TOTAL IMPLEMENTED Savings:
$85,657
Cost:
$54,349
$34,131 402,696 $50,102 6,933 $640 - $784 - $34,131
402,696
kWh
$50,102
6,933
MMBtu
$640
-
lb
$784
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes