IAC logo
IAC Assessment: SD0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1996
Principal Product Chemical miling of quarts materials for computer communicati
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 40,000
Annual Production 3,000,000 Units
Production Hrs. Annual 2,423
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,563 3,028,136 kWh $0.08
Electricity Demand $51,512 7,099 kW-months/year $7.26
Natural Gas $6,014 983 MMBtu $6.12
TOTAL ENERGY COSTS $301,089
RECOMMENDED SAVINGS* $25,661 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,963
#|Description Savings
Cost
Status Electricity Usage Other Liquid (haz) Electricity Usage Other Liquid (haz)
$ kWh $ gal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,138
Cost:
$1,520
$2,138 21,981 - - $2,138
21,981
kWh
-
-
gal
02: 2.7145 INSTALL SKYLIGHTS Savings:
$3,034
Cost:
$6,096
$3,034 22,567 - - $3,034
22,567
kWh
-
-
gal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$970
Cost:
$950
$970 10,551 - - $970
10,551
kWh
-
-
gal
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,120
Cost:
$300
$1,120 14,361 - - $1,120
14,361
kWh
-
-
gal
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$503
Cost:
$300
$503 6,448 - - $503
6,448
kWh
-
-
gal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,289
Cost:
$1,968
$2,289 22,567 - - $2,289
22,567
kWh
-
-
gal
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$9,864
Cost:
$13,875
$9,864 96,131 - - $9,864
96,131
kWh
-
-
gal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,743
Cost:
$1,255
$1,743 16,413 - - $1,743
16,413
kWh
-
-
gal
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$800
Cost:
$1,000
- - $800 - -
-
kWh
$800
-
gal
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,200
Cost:
$1,000
- - $3,200 200 -
-
kWh
$3,200
200
gal
TOTAL RECOMMENDED Savings:
$25,661
Cost:
$28,264
$21,661 211,019 $4,000 200 $21,661
211,019
kWh
$4,000
200
gal
TOTAL IMPLEMENTED Savings:
$11,963
Cost:
$7,293
$8,763 92,321 $3,200 200 $8,763
92,321
kWh
$3,200
200
gal
Savings
Cost
$ kWh $ gal
Electricity Usage Other Liquid (haz) Electricity Usage Other Liquid (haz)