IAC Assessment: SD0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1996
Principal Product Noodles, egg noodles, and fortune cookies
NAICS n/a
SIC 2079 - Edible Fats And Oils, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 35,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 4,590
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,000 850,234 kWh $0.05
Electricity Demand $51,891 2,830 kW-months/year $18.34
Natural Gas $59,709 9,445 MMBtu $6.32
TOTAL ENERGY COSTS $220,600
RECOMMENDED SAVINGS* $77,955 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,605
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,193
Cost:
$4,900
$7,193 70,047 - - - - - - $7,193
70,047
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2311 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS Savings:
$655
Cost:
$900
- - $655 104 - - - - -
-
kWh
$655
104
MMBtu
-
-
lb
-
-
$
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$4,695
Cost:
$1,100
$4,695 38,980 - - - - - - $4,695
38,980
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$262
Cost:
$153
$262 2,345 - - - - - - $262
2,345
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,200
Cost:
$865
$1,200 11,430 - - - - - - $1,200
11,430
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$494
Cost:
$287
$494 4,689 - - - - - - $494
4,689
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$456
Cost:
-
- - - - - - $456 - -
-
kWh
-
-
MMBtu
-
-
lb
$456
-
$
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$63,000
Cost:
$1,155
- - - - $63,000 180,000 - - -
-
kWh
-
-
MMBtu
$63,000
180,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$77,955
Cost:
$9,360
$13,844 127,491 $655 104 $63,000 180,000 $456 - $13,844
127,491
kWh
$655
104
MMBtu
$63,000
180,000
lb
$456
-
$
TOTAL IMPLEMENTED Savings:
$72,605
Cost:
$7,360
$9,149 88,511 - - $63,000 180,000 $456 - $9,149
88,511
kWh
-
-
MMBtu
$63,000
180,000
lb
$456
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes