IAC logo
IAC Assessment: SD0530
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0530
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2016
Principal Product Eye Care Components
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 750
Plant Area (Sq.Ft.) 210,000
Annual Production 250,000 Pieces
Production Hrs. Annual 4,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $394,504 4,989,359 kWh $0.08
Electricity Demand $263,414 10,165 kW-months/year $25.91
Electricity Fees $30,592 - $ -
TOTAL ENERGY COSTS $688,510
RECOMMENDED SAVINGS* $22,202 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,202
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$14,594
Cost:
$36,400
$10,132 128,088 $4,462 175 $10,132
128,088
kWh
$4,462
175
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,344
Cost:
$1,500
$1,194 15,096 $1,150 44 $1,194
15,096
kWh
$1,150
44
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,876
Cost:
$200
$1,876 23,720 - - $1,876
23,720
kWh
-
-
kW-months/year
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,261
Cost:
$861
$642 8,111 $619 24 $642
8,111
kWh
$619
24
kW-months/year
05: 2.7145 INSTALL SKYLIGHTS Savings:
$1,125
Cost:
$3,360
$573 7,246 $552 21 $573
7,246
kWh
$552
21
kW-months/year
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,002
Cost:
$2,590
$914 11,556 $88 3 $914
11,556
kWh
$88
3
kW-months/year
TOTAL RECOMMENDED Savings:
$22,202
Cost:
$44,911
$15,331 193,817 $6,871 268 $15,331
193,817
kWh
$6,871
268
kW-months/year
TOTAL IMPLEMENTED Savings:
$22,202
Cost:
$44,911
$15,331 193,817 $6,871 268 $15,331
193,817
kWh
$6,871
268
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand