IAC logo
IAC Assessment: SF0015
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0015
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1993
Principal Product Tire Tread Rubber
NAICS n/a
SIC 3011 - Tires And Inner Tubes
Sales $10,000,000-$50,000,000
# of Employees 57
Plant Area (Sq.Ft.) 80,000
Annual Production 10,000 Tons
Production Hrs. Annual 5,500
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $458,942 4,521,688 kWh $0.10
Natural Gas $97,361 23,619 MMBtu $4.12
TOTAL ENERGY COSTS $556,303
RECOMMENDED SAVINGS* $37,290 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,350
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,029
Cost:
$9,608
$10,029 98,769 - - $10,029
98,769
kWh
-
-
MMBtu
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$8,821
Cost:
$20,000
- - $8,821 2,140 -
-
kWh
$8,821
2,140
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,452
Cost:
$1,650
$7,452 73,271 - - $7,452
73,271
kWh
-
-
MMBtu
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,119
Cost:
$1,068
$2,119 20,809 - - $2,119
20,809
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,767
Cost:
$1,062
- - $1,767 429 -
-
kWh
$1,767
429
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,540
Cost:
$400
- - $1,540 470 -
-
kWh
$1,540
470
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,416
Cost:
$906
- - $1,416 344 -
-
kWh
$1,416
344
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,406
Cost:
$3,719
$1,406 13,775 - - $1,406
13,775
kWh
-
-
MMBtu
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,098
Cost:
-
$1,098 10,844 - - $1,098
10,844
kWh
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,030
Cost:
$1,824
$1,030 10,258 - - $1,030
10,258
kWh
-
-
MMBtu
11: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$612
Cost:
$162
- - $612 149 -
-
kWh
$612
149
MMBtu
TOTAL RECOMMENDED Savings:
$37,290
Cost:
$40,399
$23,134 227,726 $14,156 3,532 $23,134
227,726
kWh
$14,156
3,532
MMBtu
TOTAL IMPLEMENTED Savings:
$26,350
Cost:
$19,331
$21,015 206,917 $5,335 1,392 $21,015
206,917
kWh
$5,335
1,392
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas