Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1996 |
Principal Product | Dried Fruits |
NAICS | n/a |
SIC | 2034 - Dehydrated Fruits, Vegetables, Soups |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 25,000 Tons |
Production Hrs. Annual | 4,160 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $156,311 | 2,384,525 | kWh | $0.07 |
Electricity Demand | $106,186 | 8,325 | kW-months/year | $12.76 |
Natural Gas | $126,721 | 21,329 | MMBtu | $5.94 |
TOTAL ENERGY COSTS | $718,412 | |||
RECOMMENDED SAVINGS* | $294,251 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $48,649 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $7,415 Cost: $8,500 |
- | - | - | - | $7,415 | 1,310 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,415 1,310 MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,960 Cost: $20,930 |
$3,914 | 59,789 | $3,046 | 239 | - | - | - | - | - | - |
$3,914 59,789 kWh |
$3,046 239 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,794 Cost: $9,792 |
$3,273 | 49,824 | $3,674 | 288 | $(-1,153) | (-208) | - | - | - | - |
$3,273 49,824 kWh |
$3,674 288 kW-months/year |
$(-1,153) (-208) MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $3,011 Cost: $4,970 |
$1,418 | 22,860 | $1,593 | 124 | - | - | - | - | - | - |
$1,418 22,860 kWh |
$1,593 124 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,069 Cost: $1,792 |
$1,125 | 17,292 | $944 | 74 | - | - | - | - | - | - |
$1,125 17,292 kWh |
$944 74 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,248 Cost: $2,120 |
$1,220 | 18,464 | $28 | 3 | - | - | - | - | - | - |
$1,220 18,464 kWh |
$28 3 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $663 Cost: $1,089 |
- | - | - | - | $663 | 117 | - | - | - | - |
- - kWh |
- - kW-months/year |
$663 117 MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $558 Cost: $375 |
- | - | - | - | $558 | 98 | - | - | - | - |
- - kWh |
- - kW-months/year |
$558 98 MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,017 Cost: $120 |
$651 | 9,672 | $366 | 28 | - | - | - | - | - | - |
$651 9,672 kWh |
$366 28 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $932 Cost: $500 |
$597 | 9,086 | $335 | 26 | - | - | - | - | - | - |
$597 9,086 kWh |
$335 26 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $171,634 Cost: $672,500 |
- | - | - | - | - | - | $171,634 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$171,634 - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $65,621 Cost: $78,072 |
- | - | - | - | - | - | $65,621 | 436,800 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$65,621 436,800 Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $12,812 Cost: $250 |
- | - | - | - | - | - | - | - | $12,812 | 124,800 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$12,812 124,800 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $14,517 Cost: $3,115 |
- | - | - | - | - | - | $14,517 | 4,414,800 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$14,517 4,414,800 Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $294,251 Cost: $804,125 |
$12,198 | 186,987 | $9,986 | 782 | $7,483 | 1,317 | $251,772 | 4,851,600 | $12,812 | 124,800 | $12,198 186,987 kWh |
$9,986 782 kW-months/year |
$7,483 1,317 MMBtu |
$251,772 4,851,600 Tgal |
$12,812 124,800 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $48,649 Cost: $44,553 |
$11,601 | 177,901 | $9,651 | 756 | $68 | 7 | $14,517 | 4,414,800 | $12,812 | 124,800 | $11,601 177,901 kWh |
$9,651 756 kW-months/year |
$68 7 MMBtu |
$14,517 4,414,800 Tgal |
$12,812 124,800 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) |