IAC logo
IAC Assessment: SF0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1997
Principal Product Tortillas & Tortilla Chips
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 12,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 3,744
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,058 321,219 kWh $0.08
Electricity Demand $6,334 1,525 kW-months/year $4.15
Natural Gas $35,552 9,948 MMBtu $3.57
TOTAL ENERGY COSTS $79,497
RECOMMENDED SAVINGS* $73,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,063
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$219
Cost:
$376
$184 2,345 $35 8 - - - - - - $184
2,345
kWh
$35
8
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,448
Cost:
$7,560
$2,084 25,791 $364 88 - - - - - - $2,084
25,791
kWh
$364
88
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$196
Cost:
$811
$196 16,120 - - - - - - - - $196
16,120
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
04: 3.4151 MINIMIZE WATER USAGE Savings:
$1,544
Cost:
$60
- - - - $1,544 326,315 - - - - -
-
kWh
-
-
kW-months/year
$1,544
326,315
Tgal
-
-
lb
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,214
Cost:
$765
$(-262) (-3,224) - - $1,476 312,000 - - - - $(-262)
(-3,224)
kWh
-
-
kW-months/year
$1,476
312,000
Tgal
-
-
lb
-
-
$
06: 3.2111 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE Savings:
$9,844
Cost:
$900
$(-78) (-879) - - - - $9,922 56,160 - - $(-78)
(-879)
kWh
-
-
kW-months/year
-
-
Tgal
$9,922
56,160
lb
-
-
$
07: 3.2176 INCREASE USE OF AUTOMATION Savings:
$43,680
Cost:
$47,000
- - - - - - - - $43,680 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$43,680
-
$
08: 3.2176 INCREASE USE OF AUTOMATION Savings:
$13,000
Cost:
$6,000
- - - - - - - - $13,000 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$13,000
-
$
09: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$1,040
Cost:
$1,000
- - - - - - - - $1,040 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$1,040
-
$
TOTAL RECOMMENDED Savings:
$73,185
Cost:
$64,472
$2,124 40,153 $399 96 $3,020 638,315 $9,922 56,160 $57,720 - $2,124
40,153
kWh
$399
96
kW-months/year
$3,020
638,315
Tgal
$9,922
56,160
lb
$57,720
-
$
TOTAL IMPLEMENTED Savings:
$10,063
Cost:
$1,276
$106 1,466 $35 8 - - $9,922 56,160 - - $106
1,466
kWh
$35
8
kW-months/year
-
-
Tgal
$9,922
56,160
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes