Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1998 |
Principal Product | Applesauce,Applejuice,and Apple Vinegar |
NAICS | n/a |
SIC | 2033 - Canned Fruits And Vegetables |
Sales | $5,000,000-$10,000,000 |
# of Employees | 0 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 7,630 Tons |
Production Hrs. Annual | 3,120 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $82,902 | 986,225 | kWh | $0.08 |
Electricity Demand | $14,092 | 3,182 | kW-months/year | $4.43 |
Natural Gas | $76,723 | 22,550 | MMBtu | $3.40 |
TOTAL ENERGY COSTS | $184,029 | |||
RECOMMENDED SAVINGS* | $9,801 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,120 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,167 Cost: $156 |
$2,602 | 31,067 | $565 | 128 | - | - | - | - |
$2,602 31,067 kWh |
$565 128 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $878 Cost: - |
$545 | 6,448 | $333 | 75 | - | - | - | - |
$545 6,448 kWh |
$333 75 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $1,152 Cost: $1,611 |
- | - | - | - | $1,152 | 339 | - | - |
- - kWh |
- - kW-months/year |
$1,152 339 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $675 Cost: $967 |
$517 | 6,155 | $158 | 36 | - | - | - | - |
$517 6,155 kWh |
$158 36 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,803 Cost: $7,808 |
$2,281 | 27,257 | $522 | 118 | - | - | - | - |
$2,281 27,257 kWh |
$522 118 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT |
Savings: $610 Cost: $3,500 |
- | - | - | - | $610 | 133 | - | - |
- - kWh |
- - kW-months/year |
$610 133 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $516 Cost: - |
- | - | - | - | - | - | $516 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$516 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $9,801 Cost: $14,042 |
$5,945 | 70,927 | $1,578 | 357 | $1,762 | 472 | $516 | - | $5,945 70,927 kWh |
$1,578 357 kW-months/year |
$1,762 472 MMBtu |
$516 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,120 Cost: $6,234 |
$3,119 | 37,222 | $723 | 164 | $1,762 | 472 | $516 | - | $3,119 37,222 kWh |
$723 164 kW-months/year |
$1,762 472 MMBtu |
$516 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |