IAC logo
IAC Assessment: SF0300
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0300
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product Printed Circuit Board Assembly
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 53,715
Annual Production 6,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $543,594 5,267,600 kWh $0.10
Natural Gas $3,304 3,284 MMBtu $1.01
TOTAL ENERGY COSTS $646,366
RECOMMENDED SAVINGS* $77,079 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,189
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,565
Cost:
$273
$4,565 48,266 - - $4,565
48,266
kWh
-
-
kW-months/year
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,670
Cost:
$949
$2,206 23,304 $464 29 $2,206
23,304
kWh
$464
29
kW-months/year
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$57,647
Cost:
$31,100
$57,647 - - - $57,647
-
kWh
-
-
kW-months/year
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,975
Cost:
$2,706
$3,349 35,381 $626 49 $3,349
35,381
kWh
$626
49
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,974
Cost:
$3,208
$2,486 26,257 $488 38 $2,486
26,257
kWh
$488
38
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$545
Cost:
$855
$441 4,654 $104 8 $441
4,654
kWh
$104
8
kW-months/year
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$423
Cost:
$715
$356 3,784 $67 5 $356
3,784
kWh
$67
5
kW-months/year
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,280
Cost:
$8,246
$4,280 45,217 - - $4,280
45,217
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$77,079
Cost:
$48,052
$75,330 186,863 $1,749 129 $75,330
186,863
kWh
$1,749
129
kW-months/year
TOTAL IMPLEMENTED Savings:
$6,189
Cost:
$5,012
$5,133 54,215 $1,056 75 $5,133
54,215
kWh
$1,056
75
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand