IAC logo
IAC Assessment: SF0359
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0359
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2008
Principal Product Metal and Plastic Original Equipment Manufacturer (OEM) Labels
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 50,000
Annual Production 1,600,000 Pieces
Production Hrs. Annual 2,860
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,697 880,480 kWh $0.13
Electricity Demand $17,666 4,530 kW-months/year $3.90
Electricity Fees $5,838 - $ -
Natural Gas $11,154 903 MMBtu $12.35
TOTAL ENERGY COSTS $153,355
RECOMMENDED SAVINGS* $54,126 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,316
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,430
Cost:
-
- - $4,430 1,136 -
-
kWh
$4,430
1,136
kW-months/year
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$870
Cost:
$904
$792 5,876 $78 20 $792
5,876
kWh
$78
20
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,576
Cost:
$523
$1,424 10,565 $152 39 $1,424
10,565
kWh
$152
39
kW-months/year
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,314
Cost:
$1,577
$1,893 14,040 $421 108 $1,893
14,040
kWh
$421
108
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,881
Cost:
$6,200
$1,881 13,954 - - $1,881
13,954
kWh
-
-
kW-months/year
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$197
Cost:
$453
$158 1,171 $39 10 $158
1,171
kWh
$39
10
kW-months/year
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$929
Cost:
$4,808
$828 6,140 $101 26 $828
6,140
kWh
$101
26
kW-months/year
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$955
Cost:
$6,455
$791 5,869 $164 42 $791
5,869
kWh
$164
42
kW-months/year
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$40,974
Cost:
$1,575,000
$34,059 252,642 $6,915 1,773 $34,059
252,642
kWh
$6,915
1,773
kW-months/year
TOTAL RECOMMENDED Savings:
$54,126
Cost:
$1,595,920
$41,826 310,257 $12,300 3,154 $41,826
310,257
kWh
$12,300
3,154
kW-months/year
TOTAL IMPLEMENTED Savings:
$10,316
Cost:
$8,265
$5,095 37,792 $5,221 1,339 $5,095
37,792
kWh
$5,221
1,339
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand