IAC logo
IAC Assessment: SF0435
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0435
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2013
Principal Product treated water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 11
Plant Area (Sq.Ft.) 909,098
Annual Production 1,277,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $448,795 5,377,218 kWh $0.08
Electricity Demand $210,270 9,852 kW-months/year $21.34
Electricity Fees $5,601 - $ -
Natural Gas $1,200 126 MMBtu $9.55
TOTAL ENERGY COSTS $665,866
RECOMMENDED SAVINGS* $451,542 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $451,542
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$12,509
Cost:
$9,202
$8,130 97,365 $4,379 205 - - - - - - $8,130
97,365
kWh
$4,379
205
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,788
Cost:
$6,238
$5,321 63,723 $3,467 163 - - - - - - $5,321
63,723
kWh
$3,467
163
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,176
Cost:
$15,794
$6,060 72,571 $2,116 100 - - - - - - $6,060
72,571
kWh
$2,116
100
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$192,884
Cost:
$831,276
$142,971 1,712,228 $49,913 2,346 - - - - - - $142,971
1,712,228
kWh
$49,913
2,346
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,287
Cost:
$44,123
$2,885 34,552 $1,066 50 - - $837 - $499 - $2,885
34,552
kWh
$1,066
50
kW-months/year
-
-
$
$837
-
$
$499
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$209,686
Cost:
$1,399,178
$180,342 2,141,217 $29,344 924 - - - - - - $180,342
2,141,217
kWh
$29,344
924
kW-months/year
-
-
$
-
-
$
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$14,212
Cost:
-
- - - - $14,212 - - - - - -
-
kWh
-
-
kW-months/year
$14,212
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$451,542
Cost:
$2,305,811
$345,709 4,121,656 $90,285 3,788 $14,212 - $837 - $499 - $345,709
4,121,656
kWh
$90,285
3,788
kW-months/year
$14,212
-
$
$837
-
$
$499
-
$
TOTAL IMPLEMENTED Savings:
$451,542
Cost:
$2,305,811
$345,709 4,121,656 $90,285 3,788 $14,212 - $837 - $499 - $345,709
4,121,656
kWh
$90,285
3,788
kW-months/year
$14,212
-
$
$837
-
$
$499
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost