IAC logo
IAC Assessment: SJ0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product Weldments for semiconductor industry
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 44,365
Annual Production 140,000 Units
Production Hrs. Annual 4,550
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,518 370,796 kWh $0.23
Electricity Demand $20,814 1,596 kW-months/year $13.04
Natural Gas $12,690 587 MMBtu $21.62
TOTAL ENERGY COSTS $119,022
RECOMMENDED SAVINGS* $95,681 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$67,746
Cost:
$441,525
$65,883 285,203 $1,863 143 - - $65,883
285,203
kWh
$1,863
143
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,869
Cost:
$18,228
$13,631 59,103 $2,238 172 - - $13,631
59,103
kWh
$2,238
172
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,699
Cost:
$844
$1,699 7,366 - - - - $1,699
7,366
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$764
Cost:
$32
$764 3,311 - - - - $764
3,311
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$6,705
Cost:
-
- - - - $6,705 310 -
-
kWh
-
-
kW-months/year
$6,705
310
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$469
Cost:
-
$469 2,032 - - - - $469
2,032
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8
Cost:
$200
$8 33 - - - - $8
33
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$513
Cost:
$624
$476 2,065 $37 3 - - $476
2,065
kWh
$37
3
kW-months/year
-
-
MMBtu
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,761
Cost:
$2,675
$1,761 7,635 - - - - $1,761
7,635
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$147
Cost:
$50
$147 636 - - - - $147
636
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$95,681
Cost:
$464,178
$84,838 367,384 $4,138 318 $6,705 310 $84,838
367,384
kWh
$4,138
318
kW-months/year
$6,705
310
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas