IAC logo
IAC Assessment: ST0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product POINT OF PURCH. DISPLAYS
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $5,000,000-$10,000,000
# of Employees 165
Plant Area (Sq.Ft.) 0
Annual Production 3,000,000 Pieces
Production Hrs. Annual 2,400
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,283 1,262,896 kWh $0.10
Natural Gas $12,340 1,985 MMBtu $6.22
TOTAL ENERGY COSTS $139,623
RECOMMENDED SAVINGS* $54,201 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,369
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,863
Cost:
$953
$1,863 18,464 - - - - $1,863
18,464
kWh
-
-
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$174
Cost:
$200
$174 1,758 - - - - $174
1,758
kWh
-
-
MMBtu
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$302
Cost:
$46
- - $302 49 - - -
-
kWh
$302
49
MMBtu
-
-
$
04: 3.6121 BURN WASTE PAPER FOR HEAT Savings:
$10,055
Cost:
$25,200
- - $8,279 1,331 $1,776 - -
-
kWh
$8,279
1,331
MMBtu
$1,776
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$13,133
Cost:
$1,900
$13,133 130,422 - - - - $13,133
130,422
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,200
Cost:
$104
$3,200 31,653 - - - - $3,200
31,653
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,765
Cost:
$1,800
$2,069 20,516 $(-304) (-49) - - $2,069
20,516
kWh
$(-304)
(-49)
MMBtu
-
-
$
08: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$20,755
Cost:
$1,900
$20,755 - - - - - $20,755
-
kWh
-
-
MMBtu
-
-
$
09: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$605
Cost:
-
$605 5,862 - - - - $605
5,862
kWh
-
-
MMBtu
-
-
$
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,307
Cost:
$1,400
$1,774 17,585 $(-467) (-75) - - $1,774
17,585
kWh
$(-467)
(-75)
MMBtu
-
-
$
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$439
Cost:
$497
- - $439 71 - - -
-
kWh
$439
71
MMBtu
-
-
$
12: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$603
Cost:
$1,000
- - $603 97 - - -
-
kWh
$603
97
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$54,201
Cost:
$35,000
$43,573 226,260 $8,852 1,424 $1,776 - $43,573
226,260
kWh
$8,852
1,424
MMBtu
$1,776
-
$
TOTAL IMPLEMENTED Savings:
$43,369
Cost:
$8,600
$43,399 224,502 $(-30) (-4) - - $43,399
224,502
kWh
$(-30)
(-4)
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes