IAC Assessment: TA0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2001
Principal Product Industrial Paperboard Products
NAICS n/a
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 61
Plant Area (Sq.Ft.) 80,000
Annual Production 1,000 Tons
Production Hrs. Annual 4,500
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,701 1,168,016 kWh $0.04
Electricity Demand $21,425 2,708 kW-months/year $7.91
Electricity Fees $2,462 - $ -
Natural Gas $25,496 3,625 MMBtu $7.03
TOTAL ENERGY COSTS $95,084
RECOMMENDED SAVINGS* $12,755 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,404
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,587
Cost:
$585
$3,937 111,720 - - $1,650 232 $3,937
111,720
kWh
-
-
kW-months/year
$1,650
232
MMBtu
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,350
Cost:
-
$4,350 123,434 - - - - $4,350
123,434
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,597
Cost:
$480
$1,597 45,320 - - - - $1,597
45,320
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$364
Cost:
-
$364 3,600 - - - - $364
3,600
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$233
Cost:
-
$233 6,608 - - - - $233
6,608
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$210
Cost:
-
- - $210 17 - - -
-
kWh
$210
17
kW-months/year
-
-
MMBtu
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$158
Cost:
-
$71 2,019 $87 7 - - $71
2,019
kWh
$87
7
kW-months/year
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$146
Cost:
$160
$146 4,158 - - - - $146
4,158
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$110
Cost:
$106
- - - - $110 16 -
-
kWh
-
-
kW-months/year
$110
16
MMBtu
TOTAL RECOMMENDED Savings:
$12,755
Cost:
$1,331
$10,698 296,859 $297 24 $1,760 248 $10,698
296,859
kWh
$297
24
kW-months/year
$1,760
248
MMBtu
TOTAL IMPLEMENTED Savings:
$2,404
Cost:
$480
$2,194 55,528 $210 17 - - $2,194
55,528
kWh
$210
17
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas