IAC logo
IAC Assessment: TA0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Investment Casting
NAICS 331512 - Steel Investment Foundries
SIC 3324 - Steel Investment Foundries
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 200,000
Annual Production 5,500 Pieces
Production Hrs. Annual 8,556
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,562 6,131,327 kWh $0.04
Electricity Demand $98,813 16,774 kW-months/year $5.89
Electricity Fees $7,293 - $ -
Natural Gas $218,729 45,123 MMBtu $4.85
LPG $20,998 3,054 MMBtu $6.88
TOTAL ENERGY COSTS $616,395
RECOMMENDED SAVINGS* $1,533,338 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,682
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,410,425
Cost:
$467,000
$8,820 212,163 $1,605 492 - - - - $1,400,000 - $8,820
212,163
kWh
$1,605
492
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,400,000
-
$
02: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$53,166
Cost:
$17,450
- - - - $53,166 2 - - - - -
-
kWh
-
-
kW-months/year
$53,166
2
MMBtu
-
-
Tgal
-
-
$
03: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$48,231
Cost:
$30,800
- - - - - - - - $48,231 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$48,231
-
$
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$19,775
Cost:
$51,000
- - - - - - $19,775 788,600 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,775
788,600
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,741
Cost:
-
$1,741 41,890 - - - - - - - - $1,741
41,890
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$1,533,338
Cost:
$566,250
$10,561 254,053 $1,605 492 $53,166 2 $19,775 788,600 $1,448,231 - $10,561
254,053
kWh
$1,605
492
kW-months/year
$53,166
2
MMBtu
$19,775
788,600
Tgal
$1,448,231
-
$
TOTAL IMPLEMENTED Savings:
$74,682
Cost:
$68,450
$1,741 41,890 - - $53,166 2 $19,775 788,600 - - $1,741
41,890
kWh
-
-
kW-months/year
$53,166
2
MMBtu
$19,775
788,600
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes