IAC logo
IAC Assessment: TA0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2004
Principal Product Petroleum Lubricating Oil
NAICS 324191 - Petroleum Lubricating Oil and Grease Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 89,000
Annual Production 7,200,000 Pounds
Production Hrs. Annual 2,560
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $15,974 211,440 kWh $0.08
Electricity Demand $14,230 1,949 kW-months/year $7.30
Electricity Fees $155 - $ -
Natural Gas $33,863 4,381 MMBtu $7.73
TOTAL ENERGY COSTS $64,222
RECOMMENDED SAVINGS* $21,564 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$6,613
Cost:
-
- - - - $6,613 856 - - -
-
kWh
-
-
kW-months/year
$6,613
856
MMBtu
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,480
Cost:
-
- - - - - - $4,480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,480
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,760
Cost:
$1,150
- - - - $3,760 487 - - -
-
kWh
-
-
kW-months/year
$3,760
487
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,090
Cost:
$500
$1,375 19,624 $715 92 - - - - $1,375
19,624
kWh
$715
92
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,360
Cost:
$1,610
- - - - $1,360 176 - - -
-
kWh
-
-
kW-months/year
$1,360
176
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$416
Cost:
$10
$416 5,950 - - - - - - $416
5,950
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,235
Cost:
-
$2,235 31,920 - - - - - - $2,235
31,920
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$610
Cost:
$230
$400 5,760 $210 27 - - - - $400
5,760
kWh
$210
27
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,564
Cost:
$3,500
$4,426 63,254 $925 119 $11,733 1,519 $4,480 - $4,426
63,254
kWh
$925
119
kW-months/year
$11,733
1,519
MMBtu
$4,480
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $