IAC Assessment: TA0116
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: TA0116
IAC Center University of Texas, Arlington
Assessment Year 2006
Principal Product Heavy truck Part and Assembly
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 133,000
Annual Production 105,000 Pieces
Production Hrs. Annual 4,980
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $386,272 5,431,414 kWh $0.07
Electricity Demand $82,635 14,411 kW-months/year $5.73
Natural Gas $138,918 9,240 MMBtu $15.03
TOTAL ENERGY COSTS $607,825
RECOMMENDED SAVINGS* $62,925 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Primary Product Electricity Usage Electricity Demand Wood Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,371
Cost:
$16,650
$19,340 292,326 $4,031 704 - - - - $19,340
292,326
kWh
$4,031
704
kW-months/year
-
-
MMBtu
-
-
$
02: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$13,000
Cost:
-
- - - - $13,000 35,700 - - -
-
kWh
-
-
kW-months/year
$13,000
35,700
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,000
Cost:
$240
$2,483 37,522 $517 90 - - - - $2,483
37,522
kWh
$517
90
kW-months/year
-
-
MMBtu
-
-
$
04: 4.4440 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$21,734
Cost:
$1,600
$139 2,101 $835 146 - - $20,760 - $139
2,101
kWh
$835
146
kW-months/year
-
-
MMBtu
$20,760
-
$
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,820
Cost:
-
- - $1,820 318 - - - - -
-
kWh
$1,820
318
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$62,925
Cost:
$18,490
$21,962 331,949 $7,203 1,258 $13,000 35,700 $20,760 - $21,962
331,949
kWh
$7,203
1,258
kW-months/year
$13,000
35,700
MMBtu
$20,760
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Wood Primary Product Electricity Usage Electricity Demand Wood Primary Product