IAC Assessment: TN0428
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0428
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1991
Principal Product DIMENSIONAL HARDWARE
NAICS n/a
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $10,000,000-$50,000,000
# of Employees 153
Plant Area (Sq.Ft.) 0
Annual Production 14,700,000 Pounds
Production Hrs. Annual 4,410
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $268,168 5,834,408 kWh $0.05
Natural Gas $6,667 1,498 MMBtu $4.45
Wood $194,000 252,000 MMBtu $0.77
TOTAL ENERGY COSTS $468,835
RECOMMENDED SAVINGS* $247,374 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Wood Administrative Changes Electricity Usage Natural Gas Wood Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS Savings:
$217,463
Cost:
-
$222,313 4,837,632 - - $(-4,850) (-63,000) - - $222,313
4,837,632
kWh
-
-
MMBtu
$(-4,850)
(-63,000)
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$361
Cost:
$984
- - $105 23 $256 2,091 - - -
-
kWh
$105
23
MMBtu
$256
2,091
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$11,136
Cost:
-
$11,136 242,087 - - - - - - $11,136
242,087
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$8,847
Cost:
-
$8,251 179,367 - - - - $596 - $8,251
179,367
kWh
-
-
MMBtu
-
-
MMBtu
$596
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$73
Cost:
$75
- - $21 5 $52 460 - - -
-
kWh
$21
5
MMBtu
$52
460
MMBtu
-
-
$
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$2,021
Cost:
$500
- - $2,021 449 - - - - -
-
kWh
$2,021
449
MMBtu
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$742
Cost:
$510
$742 16,120 - - - - - - $742
16,120
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$634
Cost:
$2,100
$634 13,775 - - - - - - $634
13,775
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,578
Cost:
$451
$1,578 34,291 - - - - - - $1,578
34,291
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$607
Cost:
$660
$607 13,189 - - - - - - $607
13,189
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,912
Cost:
$5,900
$3,912 - - - - - - - $3,912
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$247,374
Cost:
$11,180
$249,173 5,336,461 $2,147 477 $(-4,542) (-60,449) $596 - $249,173
5,336,461
kWh
$2,147
477
MMBtu
$(-4,542)
(-60,449)
MMBtu
$596
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Wood Administrative Changes Electricity Usage Natural Gas Wood Administrative Changes