IAC logo
IAC Assessment: TN0434
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0434
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1991
Principal Product CHILDREN'S SPORTSWEAR
NAICS n/a
SIC 2321 - Men's and Boys' Shirts, Except Work Shirts
Sales $1,000,000-$5,000,000
# of Employees 380
Plant Area (Sq.Ft.) 0
Annual Production 1,080,000 Pieces
Production Hrs. Annual 2,185
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,770 956,917 kWh $0.06
Fuel Oil #2 $4,100 700 MMBtu $5.86
TOTAL ENERGY COSTS $60,870
RECOMMENDED SAVINGS* $8,522 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,522
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$1,745
Cost:
$2,550
- - $1,745 298 - - -
-
kWh
$1,745
298
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,163
Cost:
$240
$2,058 34,877 - - $105 - $2,058
34,877
kWh
-
-
MMBtu
$105
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,504
Cost:
$3,650
$1,504 25,498 - - - - $1,504
25,498
kWh
-
-
MMBtu
-
-
$
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$117
Cost:
$115
- - $117 20 - - -
-
kWh
$117
20
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$173
Cost:
$410
$173 2,931 - - - - $173
2,931
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35
Cost:
$128
$603 10,258 - - $(-568) - $603
10,258
kWh
-
-
MMBtu
$(-568)
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,785
Cost:
-
$2,785 - - - - - $2,785
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$8,522
Cost:
$7,093
$7,123 73,564 $1,862 318 $(-463) - $7,123
73,564
kWh
$1,862
318
MMBtu
$(-463)
-
$
TOTAL IMPLEMENTED Savings:
$8,522
Cost:
$7,093
$7,123 73,564 $1,862 318 $(-463) - $7,123
73,564
kWh
$1,862
318
MMBtu
$(-463)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes