IAC logo
IAC Assessment: TN0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1992
Principal Product BREAD AND BUNS
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 39,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,774 2,583,236 kWh $0.05
Natural Gas $108,923 34,018 MMBtu $3.20
TOTAL ENERGY COSTS $242,697
RECOMMENDED SAVINGS* $36,954 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,954
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$12,838
Cost:
$10,750
- - $12,838 4,012 - - -
-
kWh
$12,838
4,012
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,912
Cost:
$1,000
- - $10,912 3,410 - - -
-
kWh
$10,912
3,410
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,682
Cost:
$1,000
$2,682 51,583 - - - - $2,682
51,583
kWh
-
-
MMBtu
-
-
$
04: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$2,438
Cost:
$5,145
$2,438 46,893 - - - - $2,438
46,893
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,082
Cost:
$1,315
$1,192 22,860 - - $(-110) - $1,192
22,860
kWh
-
-
MMBtu
$(-110)
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$792
Cost:
$1,315
$792 15,240 - - - - $792
15,240
kWh
-
-
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,210
Cost:
-
$6,210 - - - - - $6,210
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$36,954
Cost:
$20,525
$13,314 136,576 $23,750 7,422 $(-110) - $13,314
136,576
kWh
$23,750
7,422
MMBtu
$(-110)
-
$
TOTAL IMPLEMENTED Savings:
$36,954
Cost:
$20,525
$13,314 136,576 $23,750 7,422 $(-110) - $13,314
136,576
kWh
$23,750
7,422
MMBtu
$(-110)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes