IAC logo
IAC Assessment: TN0561
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0561
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1995
Principal Product Master cylinders, drum brakes and vacuum boosters
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 285
Plant Area (Sq.Ft.) 175,000
Annual Production 4,470,000 Pieces
Production Hrs. Annual 7,056
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $732,258 15,260,258 kWh $0.05
Natural Gas $72,506 12,394 MMBtu $5.85
TOTAL ENERGY COSTS $956,066
RECOMMENDED SAVINGS* $88,045 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ MMBtu $ gal $ lb
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$36,158
Cost:
$15,600
$36,158 868,699 - - - - - - $36,158
868,699
kWh
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,772
Cost:
$580
$7,141 230,363 $631 107 - - - - $7,141
230,363
kWh
$631
107
MMBtu
-
-
gal
-
-
lb
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,709
Cost:
$3,775
$6,709 82,649 - - - - - - $6,709
82,649
kWh
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,227
Cost:
-
$3,227 70,633 - - - - - - $3,227
70,633
kWh
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,256
Cost:
-
$3,256 61,547 - - - - - - $3,256
61,547
kWh
-
-
MMBtu
-
-
gal
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$470
Cost:
$196
$470 8,499 - - - - - - $470
8,499
kWh
-
-
MMBtu
-
-
gal
-
-
lb
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$15,669
Cost:
$50,000
- - - - - - $15,669 123,552 -
-
kWh
-
-
MMBtu
-
-
gal
$15,669
123,552
lb
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$10,981
Cost:
$10,000
- - - - $10,981 17,160 - - -
-
kWh
-
-
MMBtu
$10,981
17,160
gal
-
-
lb
09: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$3,274
Cost:
$713
- - - - - - $3,274 8,700 -
-
kWh
-
-
MMBtu
-
-
gal
$3,274
8,700
lb
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$529
Cost:
-
- - - - - - $529 11,609 -
-
kWh
-
-
MMBtu
-
-
gal
$529
11,609
lb
TOTAL RECOMMENDED Savings:
$88,045
Cost:
$80,864
$56,961 1,322,390 $631 107 $10,981 17,160 $19,472 143,861 $56,961
1,322,390
kWh
$631
107
MMBtu
$10,981
17,160
gal
$19,472
143,861
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ gal $ lb
Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)