IAC logo
IAC Assessment: UC2206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2022
Principal Product Wastewater treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 19
Plant Area (Sq.Ft.) 80,000
Annual Production 3,285,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $584,490 5,392,290 kWh $0.11
Electricity Demand $150,083 9,765 kW-months/year $15.37
Electricity Fees $4,378 - $ -
Fuel Oil #2 $2,676 123 MMBtu $21.79
TOTAL ENERGY COSTS $741,627
RECOMMENDED SAVINGS* $128,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$31,115
Cost:
-
$1,268 11,700 $3,996 260 $32,500 - - - - - $(-6,649) - - - $1,268
11,700
kWh
$3,996
260
kW-months/year
$32,500
-
$
-
-
MMBtu
-
-
MMBtu
$(-6,649)
-
$
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,557
Cost:
$1,500
$2,880 26,568 $1,677 109 - - - - - - - - - - $2,880
26,568
kWh
$1,677
109
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$57,154
Cost:
$500
$47,859 441,504 $9,295 605 - - - - - - - - - - $47,859
441,504
kWh
$9,295
605
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,119
Cost:
$33,560
$2,611 24,090 $507 33 - - - - - - - - - - $2,611
24,090
kWh
$507
33
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,660
Cost:
$16,842
$552 5,094 $107 7 - - - - - - $400 - $1,601 - $552
5,094
kWh
$107
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$400
-
$
$1,601
-
$
06: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$1,713
Cost:
$3,300
- - - - - - $(-963) (-123) $2,676 123 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$(-963)
(-123)
MMBtu
$2,676
123
MMBtu
-
-
$
-
-
$
07: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$27,967
Cost:
$231,837
$(-16,598) (-153,118) $51,597 (-2,700) - - - - - - $(-7,032) - - - $(-16,598)
(-153,118)
kWh
$51,597
(-2,700)
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$(-7,032)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$128,284
Cost:
$287,539
$38,572 355,838 $67,179 (-1,686) $32,500 - $(-963) (-123) $2,676 123 $(-13,281) - $1,601 - $38,572
355,838
kWh
$67,179
(-1,686)
kW-months/year
$32,500
-
$
$(-963)
(-123)
MMBtu
$2,676
123
MMBtu
$(-13,281)
-
$
$1,601
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Personnel Changes Administrative Changes