Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1993
Principal Product Printed beverage cartons
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 241,800
Annual Production 0 Units
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $294,850 6,146,249 kWh $0.05
Natural Gas $304,285 61,767 MMBtu $4.93
TOTAL ENERGY COSTS $599,135
RECOMMENDED SAVINGS* $223,669 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $191,606
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,715
Cost:
$13,400
$19,715 - - - $19,715
-
kWh
-
-
MMBtu
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$602
Cost:
-
$602 - - - $602
-
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,741
Cost:
$2,000
- - $3,741 734 -
-
kWh
$3,741
734
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,200
Cost:
$5,739
$1,200 50,703 - - $1,200
50,703
kWh
-
-
MMBtu
05: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$81,110
Cost:
-
- - $81,110 15,904 -
-
kWh
$81,110
15,904
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$27,720
Cost:
$60,000
- - $27,720 8,400 -
-
kWh
$27,720
8,400
MMBtu
07: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$89,581
Cost:
$20,000
- - $89,581 - -
-
kWh
$89,581
-
MMBtu
TOTAL RECOMMENDED Savings:
$223,669
Cost:
$101,139
$21,517 50,703 $202,152 25,038 $21,517
50,703
kWh
$202,152
25,038
MMBtu
TOTAL IMPLEMENTED Savings:
$191,606
Cost:
$39,139
$20,915 50,703 $170,691 15,904 $20,915
50,703
kWh
$170,691
15,904
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas