IAC logo
IAC Assessment: UD0456
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0456
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product auto starters and alternators
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 300,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 6,300
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $587,000 10,662,075 kWh $0.06
Natural Gas $89,820 16,917 MMBtu $5.31
TOTAL ENERGY COSTS $676,820
RECOMMENDED SAVINGS* $90,302 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $87,582
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes
$ kWh $ MMBtu $ $ $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$38,300
Cost:
$70,000
- - - - - - $38,300 - -
-
kWh
-
-
MMBtu
-
-
$
$38,300
-
$
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$12,684
Cost:
-
$12,684 129,836 - - - - - - $12,684
129,836
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,700
Cost:
$24,000
- - $10,700 2,140 - - - - -
-
kWh
$10,700
2,140
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,644
Cost:
$12,083
$5,117 74,150 $(-473) (-95) - - - - $5,117
74,150
kWh
$(-473)
(-95)
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,574
Cost:
$58,500
$19,774 442,556 $(-2,820) (-564) $1,620 - - - $19,774
442,556
kWh
$(-2,820)
(-564)
MMBtu
$1,620
-
$
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,680
Cost:
-
$5,030 194,607 $(-1,328) (-266) $(-1,022) - - - $5,030
194,607
kWh
$(-1,328)
(-266)
MMBtu
$(-1,022)
-
$
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,720
Cost:
-
$2,720 - - - - - - - $2,720
-
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$90,302
Cost:
$164,583
$45,325 841,149 $6,079 1,215 $598 - $38,300 - $45,325
841,149
kWh
$6,079
1,215
MMBtu
$598
-
$
$38,300
-
$
TOTAL IMPLEMENTED Savings:
$87,582
Cost:
$164,583
$42,605 841,149 $6,079 1,215 $598 - $38,300 - $42,605
841,149
kWh
$6,079
1,215
MMBtu
$598
-
$
$38,300
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes