Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1996 |
Principal Product | blow molded plastic bottles |
NAICS | n/a |
SIC | 3085 - Plastics Bottles |
Sales | $10,000,000-$50,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 185,000 |
Annual Production | 160,000,000 Pieces |
Production Hrs. Annual | 8,500 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $281,582 | 9,570,633 | kWh | $0.03 |
Electricity Demand | $175,685 | 16,716 | kW-months/year | $10.51 |
Natural Gas | $26,160 | 5,634 | MMBtu | $4.64 |
TOTAL ENERGY COSTS | $483,427 | |||
RECOMMENDED SAVINGS* | $70,857 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $55,282 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $55,282 Cost: $12,000 |
$23,338 | 1,061,254 | $21,064 | 1,498 | - | - | $10,880 | - |
$23,338 1,061,254 kWh |
$21,064 1,498 kW-months/year |
- - Tgal |
$10,880 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,981 Cost: - |
$2,618 | 118,992 | $2,363 | 168 | - | - | - | - |
$2,618 118,992 kWh |
$2,363 168 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $1,080 Cost: $100 |
- | - | $1,080 | 77 | - | - | - | - |
- - kWh |
$1,080 77 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,214 Cost: $11,929 |
$3,410 | 162,368 | $2,804 | 267 | - | - | - | - |
$3,410 162,368 kWh |
$2,804 267 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $3,300 Cost: $500 |
- | - | - | - | $3,300 | 668,000 | - | - |
- - kWh |
- - kW-months/year |
$3,300 668,000 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $70,857 Cost: $24,529 |
$29,366 | 1,342,614 | $27,311 | 2,010 | $3,300 | 668,000 | $10,880 | - | $29,366 1,342,614 kWh |
$27,311 2,010 kW-months/year |
$3,300 668,000 Tgal |
$10,880 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $55,282 Cost: $12,000 |
$23,338 | 1,061,254 | $21,064 | 1,498 | - | - | $10,880 | - | $23,338 1,061,254 kWh |
$21,064 1,498 kW-months/year |
- - Tgal |
$10,880 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes |