IAC logo
IAC Assessment: UD0512
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0512
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1997
Principal Product machinery
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 97,000
Annual Production 0 Pieces
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,132 3,801,876 kWh $0.02
Electricity Demand $122,038 7,788 kW-months/year $15.67
Natural Gas $38,394 7,774 MMBtu $4.94
TOTAL ENERGY COSTS $274,564
RECOMMENDED SAVINGS* $192,844 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $ $ $
01: 3.2161 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE Savings:
$123,592
Cost:
$180,000
- - - - $21,120 59,400 $75,000 - $27,472 - -
-
kWh
-
-
kW-months/year
$21,120
59,400
gal
$75,000
-
$
$27,472
-
$
02: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$30,443
Cost:
$20,000
- - - - $11,340 31,500 $960 - $18,143 - -
-
kWh
-
-
kW-months/year
$11,340
31,500
gal
$960
-
$
$18,143
-
$
03: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$24,132
Cost:
-
- - $24,132 900 - - - - - - -
-
kWh
$24,132
900
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$7,710
Cost:
$5,000
- - $7,710 180 - - - - - - -
-
kWh
$7,710
180
kW-months/year
-
-
gal
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,882
Cost:
$12,861
$2,189 104,338 $3,693 240 - - - - - - $2,189
104,338
kWh
$3,693
240
kW-months/year
-
-
gal
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,085
Cost:
$2,465
$390 18,464 $695 44 - - - - - - $390
18,464
kWh
$695
44
kW-months/year
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$192,844
Cost:
$220,326
$2,579 122,802 $36,230 1,364 $32,460 90,900 $75,960 - $45,615 - $2,579
122,802
kWh
$36,230
1,364
kW-months/year
$32,460
90,900
gal
$75,960
-
$
$45,615
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost