IAC Assessment: UD0784
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0784
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2008
Principal Product PVC Fencing Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 156
Plant Area (Sq.Ft.) 222,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $834,882 10,706,088 kWh $0.08
Natural Gas $73,266 6,072 MMBtu $12.07
TOTAL ENERGY COSTS $908,148
RECOMMENDED SAVINGS* $329,051 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.623 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME Savings:
$123,480
Cost:
$15,500
- - - - - - - - $123,480 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$123,480
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$46,375
Cost:
$75,000
$27,972 756,000 $18,403 90 - - - - - - $27,972
756,000
kWh
$18,403
90
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$44,362
Cost:
$13,500
- - - - $44,362 - - - - - -
-
kWh
-
-
kW-months/year
$44,362
-
$
-
-
MMBtu
-
-
$
04: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$19,834
Cost:
-
- - $19,834 97 - - - - - - -
-
kWh
$19,834
97
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$19,298
Cost:
$4,400
$11,630 315,000 $7,668 38 - - - - - - $11,630
315,000
kWh
$7,668
38
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,375
Cost:
$24,502
$8,684 235,200 $5,725 28 - - - - $966 - $8,684
235,200
kWh
$5,725
28
kW-months/year
-
-
$
-
-
MMBtu
$966
-
$
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$14,677
Cost:
$26,000
- - - - - - $14,677 1,216 - - -
-
kWh
-
-
kW-months/year
-
-
$
$14,677
1,216
MMBtu
-
-
$
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$10,565
Cost:
$24,000
$6,374 172,284 $4,191 21 - - - - - - $6,374
172,284
kWh
$4,191
21
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,327
Cost:
$17,943
$3,738 101,239 $5,589 41 - - - - - - $3,738
101,239
kWh
$5,589
41
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,128
Cost:
-
$7,128 192,665 - - - - - - - - $7,128
192,665
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,237
Cost:
$12,500
$3,785 102,312 $1,452 7 - - - - - - $3,785
102,312
kWh
$1,452
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,465
Cost:
$7,440
$3,712 100,585 $1,479 7 - - - - $274 - $3,712
100,585
kWh
$1,479
7
kW-months/year
-
-
$
-
-
MMBtu
$274
-
$
13: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,512
Cost:
-
$2,512 67,900 - - - - - - - - $2,512
67,900
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
14: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,907
Cost:
-
$1,150 31,080 $757 4 - - - - - - $1,150
31,080
kWh
$757
4
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
15: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,701
Cost:
$2,000
$1,026 27,720 $675 3 - - - - - - $1,026
27,720
kWh
$675
3
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
16: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$828
Cost:
-
$828 22,400 - - - - - - - - $828
22,400
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
17: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$980
Cost:
$1,000
$591 15,960 $389 2 - - - - - - $591
15,960
kWh
$389
2
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$329,051
Cost:
$223,785
$79,130 2,140,345 $66,162 338 $44,362 - $14,677 1,216 $124,720 - $79,130
2,140,345
kWh
$66,162
338
kW-months/year
$44,362
-
$
$14,677
1,216
MMBtu
$124,720
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes