IAC logo
IAC Assessment: UF0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1992
Principal Product PRE-STRESSED CONCRETE
NAICS n/a
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 55
Plant Area (Sq.Ft.) 0
Annual Production 59,000 Tons
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $440,417 6,616,354 kWh $0.07
LPG $45,595 7,010 MMBtu $6.50
Fuel Oil #2 $4,912 755 MMBtu $6.51
TOTAL ENERGY COSTS $490,924
RECOMMENDED SAVINGS* $42,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,787
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$610
Cost:
$642
$610 9,672 - - $610
9,672
kWh
-
-
MMBtu
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,143
Cost:
$4,000
$4,143 57,737 - - $4,143
57,737
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$267
Cost:
$550
$267 4,103 - - $267
4,103
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,380
Cost:
$4,766
$3,380 50,410 - - $3,380
50,410
kWh
-
-
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,445
Cost:
$1,200
$1,445 21,688 - - $1,445
21,688
kWh
-
-
MMBtu
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$1,567
Cost:
$2,820
$1,567 23,447 - - $1,567
23,447
kWh
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,518
Cost:
$49,969
$10,518 157,093 - - $10,518
157,093
kWh
-
-
MMBtu
08: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$10,050
Cost:
-
$10,050 - - - $10,050
-
kWh
-
-
MMBtu
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,881
Cost:
$17,195
- - $10,881 1,674 -
-
kWh
$10,881
1,674
MMBtu
TOTAL RECOMMENDED Savings:
$42,861
Cost:
$81,142
$31,980 324,150 $10,881 1,674 $31,980
324,150
kWh
$10,881
1,674
MMBtu
TOTAL IMPLEMENTED Savings:
$17,787
Cost:
$59,947
$17,787 266,413 - - $17,787
266,413
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas