Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1996 |
Principal Product | Animal Feed |
NAICS | n/a |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 28 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 105,288 Tons |
Production Hrs. Annual | 5,616 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $92,011 | 2,041,325 | kWh | $0.05 |
Electricity Demand | $66,967 | 6,964 | kW-months/year | $9.62 |
Natural Gas | $2,328 | 358 | MMBtu | $6.50 |
Fuel Oil #2 | $29,943 | 6,450 | MMBtu | $4.64 |
TOTAL ENERGY COSTS | $191,249 | |||
RECOMMENDED SAVINGS* | $66,107 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,837 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,854 Cost: $13,343 |
$2,710 | 60,375 | $144 | 15 | - | - | - | - | - | - | - | - |
$2,710 60,375 kWh |
$144 15 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $364 Cost: $5,028 |
$251 | 5,569 | $113 | 12 | - | - | - | - | - | - | - | - |
$251 5,569 kWh |
$113 12 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $981 Cost: $2,530 |
$981 | 20,223 | - | - | - | - | - | - | - | - | - | - |
$981 20,223 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,837 Cost: $1,350 |
$1,837 | 23,447 | - | - | - | - | - | - | - | - | - | - |
$1,837 23,447 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $1,164 Cost: $3,500 |
- | - | - | - | $1,164 | 179 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,164 179 MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $5,675 Cost: $5,000 |
- | - | - | - | - | - | $2,488 | 537 | - | - | $3,187 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,488 537 MMBtu |
- - $ |
$3,187 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $53,232 Cost: $133,000 |
$(-109) | (-2,345) | $(-12) | (-1) | - | - | - | - | $53,353 | - | - | - |
$(-109) (-2,345) kWh |
$(-12) (-1) kW-months/year |
- - MMBtu |
- - MMBtu |
$53,353 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $66,107 Cost: $163,751 |
$5,670 | 107,269 | $245 | 26 | $1,164 | 179 | $2,488 | 537 | $53,353 | - | $3,187 | - | $5,670 107,269 kWh |
$245 26 kW-months/year |
$1,164 179 MMBtu |
$2,488 537 MMBtu |
$53,353 - $ |
$3,187 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,837 Cost: $1,350 |
$1,837 | 23,447 | - | - | - | - | - | - | - | - | - | - | $1,837 23,447 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes | Water Consumption |