IAC logo
IAC Assessment: UF0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1997
Principal Product Paper & plastic bags & polyethylene sheeting
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $1,000,000-$5,000,000
# of Employees 118
Plant Area (Sq.Ft.) 186,000
Annual Production 188,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,473 3,716,589 kWh $0.04
Electricity Demand $52,927 7,396 kW-months/year $7.16
Natural Gas $21,124 2,995 MMBtu $7.05
LPG $13,508 1,765 MMBtu $7.65
TOTAL ENERGY COSTS $262,032
RECOMMENDED SAVINGS* $74,750 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,489
Cost:
$8,739
$3,260 77,667 $1,229 172 - - - - - - $3,260
77,667
kWh
$1,229
172
kW-months/year
-
-
lb
-
-
$
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,714
Cost:
$5,256
$3,563 84,701 $1,151 161 - - - - - - $3,563
84,701
kWh
$1,151
161
kW-months/year
-
-
lb
-
-
$
-
-
%
03: 2.7122 DISCONNECT BALLASTS Savings:
$2,703
Cost:
$480
$1,993 46,893 $710 90 - - - - - - $1,993
46,893
kWh
$710
90
kW-months/year
-
-
lb
-
-
$
-
-
%
04: 2.7145 INSTALL SKYLIGHTS Savings:
$4,814
Cost:
$8,200
$4,814 114,596 - - - - - - - - $4,814
114,596
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
%
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,260
Cost:
$1,459
$1,019 24,326 $241 34 - - - - - - $1,019
24,326
kWh
$241
34
kW-months/year
-
-
lb
-
-
$
-
-
%
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,732
Cost:
$1,200
$2,732 48,652 - - - - - - - - $2,732
48,652
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
%
07: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$48,686
Cost:
$960
- - - - - - $48,686 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$48,686
-
$
-
-
%
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$672
Cost:
$600
- - - - $672 72 - - - - -
-
kWh
-
-
kW-months/year
$672
72
lb
-
-
$
-
-
%
09: 3.1121 USE MORE EFFICIENT ADHESIVE APPLICATORS Savings:
$4,680
Cost:
$320
- - - - - - - - $4,680 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$4,680
-
%
TOTAL RECOMMENDED Savings:
$74,750
Cost:
$27,214
$17,381 396,835 $3,331 457 $672 72 $48,686 - $4,680 - $17,381
396,835
kWh
$3,331
457
kW-months/year
$672
72
lb
$48,686
-
$
$4,680
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Increase in Production