IAC logo
IAC Assessment: UF0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1997
Principal Product Grain and Feed Ingredients
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $50,000,000-$100,000,000
# of Employees 20
Plant Area (Sq.Ft.) 50,000
Annual Production 330,000 Tons
Production Hrs. Annual 3,900
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,713 654,162 kWh $0.04
Electricity Demand $38,299 4,340 kW-months/year $8.82
TOTAL ENERGY COSTS $67,732
RECOMMENDED SAVINGS* $20,656 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,199
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$366
Cost:
$1,080
$207 4,689 $159 18 - - - - $207
4,689
kWh
$159
18
kW-months/year
-
-
lb
-
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$223
Cost:
$600
$223 4,982 - - - - - - $223
4,982
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$692
Cost:
$500
$692 6,741 - - - - - - $692
6,741
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,726
Cost:
-
- - $5,726 649 - - - - -
-
kWh
$5,726
649
kW-months/year
-
-
lb
-
-
$
05: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$6,707
Cost:
$17,000
- - - - - - $6,707 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,707
-
$
06: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$3,161
Cost:
-
- - - - - - $3,161 - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,161
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,347
Cost:
-
- - - - - - $2,347 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,347
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$720
Cost:
-
- - - - $720 12,000 - - -
-
kWh
-
-
kW-months/year
$720
12,000
lb
-
-
$
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$714
Cost:
$500
- - - - - - $714 - -
-
kWh
-
-
kW-months/year
-
-
lb
$714
-
$
TOTAL RECOMMENDED Savings:
$20,656
Cost:
$19,680
$1,122 16,412 $5,885 667 $720 12,000 $12,929 - $1,122
16,412
kWh
$5,885
667
kW-months/year
$720
12,000
lb
$12,929
-
$
TOTAL IMPLEMENTED Savings:
$10,199
Cost:
$1,000
$692 6,741 $5,726 649 $720 12,000 $3,061 - $692
6,741
kWh
$5,726
649
kW-months/year
$720
12,000
lb
$3,061
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes