IAC logo
IAC Assessment: UF0502
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0502
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2017
Principal Product Large Steel Pipes
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 220,000
Annual Production 305,431 Tons
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,297,376 14,403,599 kWh $0.09
Natural Gas $48,392 10,425 MMBtu $4.64
Other Gas $39,026 229 MMBtu $170.07
TOTAL ENERGY COSTS $1,384,794
RECOMMENDED SAVINGS* $315,213 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Other Gas Primary Raw Material Ancillary Material Cost Electricity Usage Other Gas Primary Raw Material Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$292,994
Cost:
-
- - $19,954 81 $259,233 - $13,807 - -
-
kWh
$19,954
81
MMBtu
$259,233
-
$
$13,807
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,062
Cost:
$2,182
$9,062 100,689 - - - - - - $9,062
100,689
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$7,986
Cost:
-
$7,986 88,733 - - - - - - $7,986
88,733
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$2,634
Cost:
-
- - $507 3 - - $2,127 - -
-
kWh
$507
3
MMBtu
-
-
$
$2,127
-
$
05: 2.5194 REDESIGN PROCESS Savings:
$1,490
Cost:
$1,800
$1,490 16,599 - - - - - - $1,490
16,599
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,047
Cost:
$57
$1,047 11,638 - - - - - - $1,047
11,638
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$315,213
Cost:
$4,039
$19,585 217,659 $20,461 84 $259,233 - $15,934 - $19,585
217,659
kWh
$20,461
84
MMBtu
$259,233
-
$
$15,934
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Other Gas Primary Raw Material Ancillary Material Cost Electricity Usage Other Gas Primary Raw Material Ancillary Material Cost