IAC Assessment: UF0570
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0570
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 333,900
Annual Production 4,999,150 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $640,333 16,696,800 kWh $0.04
Electricity Demand $243,999 31,652 kW-months/year $7.71
Electricity Fees $25,924 - $ -
TOTAL ENERGY COSTS $910,256
RECOMMENDED SAVINGS* $206,068 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $184,778
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$61,494
Cost:
$87,677
$44,413 1,168,776 $17,081 2,216 - - - - $44,413
1,168,776
kWh
$17,081
2,216
kW-months/year
-
-
$
-
-
$
02: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$15,702
Cost:
$33,667
$15,702 413,200 - - - - - - $15,702
413,200
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$12,945
Cost:
$20,214
$12,945 340,671 - - - - - - $12,945
340,671
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,034
Cost:
$32,610
$7,885 207,507 $4,149 538 - - - - $7,885
207,507
kWh
$4,149
538
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,674
Cost:
$35,369
$7,061 185,817 $4,613 598 - - - - $7,061
185,817
kWh
$4,613
598
kW-months/year
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,026
Cost:
$12,390
$4,026 105,954 - - - - - - $4,026
105,954
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$63,448
Cost:
$10,000
$63,448 1,669,680 - - - - - - $63,448
1,669,680
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 4.446 AUTOMATE FINISHING PROCESS Savings:
$17,264
Cost:
$3,564
- - - - - - $17,264 - -
-
kWh
-
-
kW-months/year
-
-
$
$17,264
-
$
09: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$7,481
Cost:
-
- - - - $7,481 - - - -
-
kWh
-
-
kW-months/year
$7,481
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$206,068
Cost:
$235,491
$155,480 4,091,605 $25,843 3,352 $7,481 - $17,264 - $155,480
4,091,605
kWh
$25,843
3,352
kW-months/year
$7,481
-
$
$17,264
-
$
TOTAL IMPLEMENTED Savings:
$184,778
Cost:
$219,537
$151,454 3,985,651 $25,843 3,352 $7,481 - - - $151,454
3,985,651
kWh
$25,843
3,352
kW-months/year
$7,481
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost