IAC Assessment: UK1603
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1603
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2016
Principal Product Shampoos and Conditioners
NAICS 325620 - Toilet Preparation Manufacturing
SIC 2844 - Toilet Preparations
Sales $100,000,000-$500,000,000
# of Employees 341
Plant Area (Sq.Ft.) 304,000
Annual Production 183,000,000 Units
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $503,809 11,144,781 kWh $0.05
Electricity Demand $300,211 22,472 kW-months/year $13.36
Electricity Fees $1,748 - $ -
Natural Gas $292,361 44,492 MMBtu $6.57
TOTAL ENERGY COSTS $1,098,129
RECOMMENDED SAVINGS* $210,664 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $171,036
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$89,730
Cost:
$85,358
$55,841 1,235,238 $24,729 1,851 - - $9,160 - $55,841
1,235,238
kWh
$24,729
1,851
kW-months/year
-
-
MMBtu
$9,160
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$3,306
Cost:
$1,445
$3,306 73,140 - - - - - - $3,306
73,140
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$18,272
Cost:
$35,000
$6,729 148,870 $11,543 864 - - - - $6,729
148,870
kWh
$11,543
864
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$9,160
Cost:
$14,700
$1,785 39,500 $7,375 552 - - - - $1,785
39,500
kWh
$7,375
552
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,058
Cost:
-
$3,058 67,663 - - - - - - $3,058
67,663
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,304
Cost:
$1,600
$1,304 28,859 - - - - - - $1,304
28,859
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$16,948
Cost:
-
$8,182 181,008 $2,886 216 $5,880 895 - - $8,182
181,008
kWh
$2,886
216
kW-months/year
$5,880
895
MMBtu
-
-
$
08: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$33,264
Cost:
$30,000
- - - - $33,264 5,063 - - -
-
kWh
-
-
kW-months/year
$33,264
5,063
MMBtu
-
-
$
09: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$33,165
Cost:
$58,682
- - - - $33,165 5,048 - - -
-
kWh
-
-
kW-months/year
$33,165
5,048
MMBtu
-
-
$
10: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$2,457
Cost:
-
- - - - $2,457 374 - - -
-
kWh
-
-
kW-months/year
$2,457
374
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$210,664
Cost:
$226,785
$80,205 1,774,278 $46,533 3,483 $74,766 11,380 $9,160 - $80,205
1,774,278
kWh
$46,533
3,483
kW-months/year
$74,766
11,380
MMBtu
$9,160
-
$
TOTAL IMPLEMENTED Savings:
$171,036
Cost:
$195,340
$73,841 1,633,475 $46,533 3,483 $41,502 6,317 $9,160 - $73,841
1,633,475
kWh
$46,533
3,483
kW-months/year
$41,502
6,317
MMBtu
$9,160
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes