IAC logo
IAC Assessment: UL0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Ice Making Machines
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 40,000
Annual Production 406 Pieces
Production Hrs. Annual 2,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $199,462 7,856,682 kWh $0.03
Electricity Demand $175,563 24,936 kW-months/year $7.04
Natural Gas $31,944 24,570 MMBtu $1.30
TOTAL ENERGY COSTS $411,329
RECOMMENDED SAVINGS* $7,422 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $248
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$248
Cost:
$9,180
$93 3,810 $155 22 - - - - - - $93
3,810
kWh
$155
22
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$997
Cost:
$3,214
$365 14,361 $632 90 - - - - - - $365
14,361
kWh
$632
90
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,268
Cost:
$100
$684 26,964 $584 83 - - - - - - $684
26,964
kWh
$584
83
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$694
Cost:
$20
$379 14,947 $315 45 - - - - - - $379
14,947
kWh
$315
45
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$1,928
Cost:
$2,000
$311 12,309 $196 29 $1,421 1,119 - - - - $311
12,309
kWh
$196
29
kW-months/year
$1,421
1,119
MMBtu
-
-
gal
-
-
lb
06: 3.5221 RECYCLE CASTING SAND Savings:
$151
Cost:
-
- - - - - - - - $151 194,400 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$151
194,400
lb
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,136
Cost:
-
- - - - - - $2,136 120 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,136
120
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$7,422
Cost:
$14,514
$1,832 72,391 $1,882 269 $1,421 1,119 $2,136 120 $151 194,400 $1,832
72,391
kWh
$1,882
269
kW-months/year
$1,421
1,119
MMBtu
$2,136
120
gal
$151
194,400
lb
TOTAL IMPLEMENTED Savings:
$248
Cost:
$9,180
$93 3,810 $155 22 - - - - - - $93
3,810
kWh
$155
22
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)