IAC logo
IAC Assessment: UL0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Plastic Bottles
NAICS n/a
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 103
Plant Area (Sq.Ft.) 57,000
Annual Production 242,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,457 8,682,005 kWh $0.02
Electricity Demand $145,807 14,462 kW-months/year $10.08
TOTAL ENERGY COSTS $308,052
RECOMMENDED SAVINGS* $38,761 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$617
Cost:
$2,882
$437 24,619 $180 29 - - - - $437
24,619
kWh
$180
29
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$494
Cost:
$14,360
$272 15,533 $222 22 - - - - $272
15,533
kWh
$222
22
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,141
Cost:
$87
$627 35,463 $514 51 - - - - $627
35,463
kWh
$514
51
kW-months/year
-
-
lb
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$33,525
Cost:
$3,500
- - - - $60 1,238 $33,465 - -
-
kWh
-
-
kW-months/year
$60
1,238
lb
$33,465
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,984
Cost:
-
- - - - $2,984 67,500 - - -
-
kWh
-
-
kW-months/year
$2,984
67,500
lb
-
-
$
TOTAL RECOMMENDED Savings:
$38,761
Cost:
$20,829
$1,336 75,615 $916 102 $3,044 68,738 $33,465 - $1,336
75,615
kWh
$916
102
kW-months/year
$3,044
68,738
lb
$33,465
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes