Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1996 |
Principal Product | Wood Office Furniture |
NAICS | n/a |
SIC | 2521 - Wood Office Furniture |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 138,560 |
Annual Production | 25,000 Pieces |
Production Hrs. Annual | 5,250 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $149,277 | 2,358,441 | kWh | $0.06 |
Natural Gas | $7,254 | 1,538 | MMBtu | $4.72 |
TOTAL ENERGY COSTS | $163,331 | |||
RECOMMENDED SAVINGS* | $49,216 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,669 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (haz) | Administrative Changes | Primary Raw Material | Electricity Usage | Solid Waste (haz) | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $278 Cost: $11,520 |
$278 | 4,396 | - | - | - | - | - | - |
$278 4,396 kWh |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,091 Cost: $2,901 |
$2,091 | 33,118 | - | - | - | - | - | - |
$2,091 33,118 kWh |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $984 Cost: $60 |
$984 | 15,533 | - | - | - | - | - | - |
$984 15,533 kWh |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $5,547 Cost: - |
- | - | $131 | 4,000 | $2,522 | - | $2,894 | - |
- - kWh |
$131 4,000 lb |
$2,522 - $ |
$2,894 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $40,316 Cost: $31,000 |
- | - | $109 | 5,210 | $3,841 | - | $36,366 | - |
- - kWh |
$109 5,210 lb |
$3,841 - $ |
$36,366 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,216 Cost: $45,481 |
$3,353 | 53,047 | $240 | 9,210 | $6,363 | - | $39,260 | - | $3,353 53,047 kWh |
$240 9,210 lb |
$6,363 - $ |
$39,260 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,669 Cost: $45,481 |
$3,353 | 53,047 | $109 | 5,210 | $3,841 | - | $36,366 | - | $3,353 53,047 kWh |
$109 5,210 lb |
$3,841 - $ |
$36,366 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Solid Waste (haz) | Administrative Changes | Primary Raw Material | Electricity Usage | Solid Waste (haz) | Administrative Changes | Primary Raw Material |