IAC logo
IAC Assessment: UL0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Wood Office Furniture
NAICS n/a
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 138,560
Annual Production 25,000 Pieces
Production Hrs. Annual 5,250
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,277 2,358,441 kWh $0.06
Natural Gas $7,254 1,538 MMBtu $4.72
TOTAL ENERGY COSTS $163,331
RECOMMENDED SAVINGS* $49,216 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,669
#|Description Savings
Cost
Status Electricity Usage Solid Waste (haz) Administrative Changes Primary Raw Material Electricity Usage Solid Waste (haz) Administrative Changes Primary Raw Material
$ kWh $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$278
Cost:
$11,520
$278 4,396 - - - - - - $278
4,396
kWh
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,091
Cost:
$2,901
$2,091 33,118 - - - - - - $2,091
33,118
kWh
-
-
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$984
Cost:
$60
$984 15,533 - - - - - - $984
15,533
kWh
-
-
lb
-
-
$
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$5,547
Cost:
-
- - $131 4,000 $2,522 - $2,894 - -
-
kWh
$131
4,000
lb
$2,522
-
$
$2,894
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$40,316
Cost:
$31,000
- - $109 5,210 $3,841 - $36,366 - -
-
kWh
$109
5,210
lb
$3,841
-
$
$36,366
-
$
TOTAL RECOMMENDED Savings:
$49,216
Cost:
$45,481
$3,353 53,047 $240 9,210 $6,363 - $39,260 - $3,353
53,047
kWh
$240
9,210
lb
$6,363
-
$
$39,260
-
$
TOTAL IMPLEMENTED Savings:
$43,669
Cost:
$45,481
$3,353 53,047 $109 5,210 $3,841 - $36,366 - $3,353
53,047
kWh
$109
5,210
lb
$3,841
-
$
$36,366
-
$
Savings
Cost
$ kWh $ lb $ $ $ $
Electricity Usage Solid Waste (haz) Administrative Changes Primary Raw Material Electricity Usage Solid Waste (haz) Administrative Changes Primary Raw Material