IAC logo
IAC Assessment: UL0165
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0165
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Wood Office Furniture
NAICS n/a
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 96
Plant Area (Sq.Ft.) 124,635
Annual Production 18,780 Pieces
Production Hrs. Annual 5,000
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,984 1,109,320 kWh $0.06
Natural Gas $24,894 5,748 MMBtu $4.33
TOTAL ENERGY COSTS $108,299
RECOMMENDED SAVINGS* $138,064 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $126,617
#|Description Savings
Cost
Status Electricity Usage Solid Waste (haz) Administrative Changes Primary Raw Material Electricity Usage Solid Waste (haz) Administrative Changes Primary Raw Material
$ kWh $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$489
Cost:
$795
$489 7,620 - - - - - - $489
7,620
kWh
-
-
lb
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$135
Cost:
$40
$135 2,052 - - - - - - $135
2,052
kWh
-
-
lb
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$197
Cost:
$3,920
$197 2,931 - - - - - - $197
2,931
kWh
-
-
lb
-
-
$
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$11,447
Cost:
-
- - $267 10,400 $5,200 - $5,980 - -
-
kWh
$267
10,400
lb
$5,200
-
$
$5,980
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$125,796
Cost:
$67,000
- - $218 11,716 $8,401 - $117,177 - -
-
kWh
$218
11,716
lb
$8,401
-
$
$117,177
-
$
TOTAL RECOMMENDED Savings:
$138,064
Cost:
$71,755
$821 12,603 $485 22,116 $13,601 - $123,157 - $821
12,603
kWh
$485
22,116
lb
$13,601
-
$
$123,157
-
$
TOTAL IMPLEMENTED Savings:
$126,617
Cost:
$71,755
$821 12,603 $218 11,716 $8,401 - $117,177 - $821
12,603
kWh
$218
11,716
lb
$8,401
-
$
$117,177
-
$
Savings
Cost
$ kWh $ lb $ $ $ $
Electricity Usage Solid Waste (haz) Administrative Changes Primary Raw Material Electricity Usage Solid Waste (haz) Administrative Changes Primary Raw Material