IAC Assessment: UM0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1994
Principal Product Pickling and slitting
NAICS n/a
SIC 3399 - Primary Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 190,000
Annual Production 600,000 Tons
Production Hrs. Annual 8,400
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Natural Gas $307,796 114,830 MMBtu $2.68
TOTAL ENERGY COSTS $307,796
RECOMMENDED SAVINGS* $18,278 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,781
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,126
Cost:
$13,020
- - $9,126 3,386 -
-
kWh
$9,126
3,386
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,031
Cost:
$7,886
- - $3,031 1,125 -
-
kWh
$3,031
1,125
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$497
Cost:
$1,000
- - $497 185 -
-
kWh
$497
185
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,000
Cost:
-
$5,000 - - - $5,000
-
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$624
Cost:
$189
- - $624 233 -
-
kWh
$624
233
MMBtu
TOTAL RECOMMENDED Savings:
$18,278
Cost:
$22,095
$5,000 - $13,278 4,929 $5,000
-
kWh
$13,278
4,929
MMBtu
TOTAL IMPLEMENTED Savings:
$17,781
Cost:
$21,095
$5,000 - $12,781 4,744 $5,000
-
kWh
$12,781
4,744
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas